Anthony from Bayville, NJ has been a Green Sun Energy Services client since August of 2014. He signed at the end of August and the array was producing by the middle of November, 16 LG 275 watt panels on Enphase M250 microinverters with QuickMount racking and an array skirt. At 4.4 kW it is a compact system designed for about 5,215 kWh a year, sized to the roof it sits on. Bayville is in Ocean County, a few minutes from Barnegat Bay.
Project Facts
- Location
- Bayville, NJ
- Service
- Solar Panel Installation
- Client since
- August 2014
- Panels
- LG Model # 275N1C-G3/35mm
- Panels
- 16
- System size
- 4.40 kW
- Inverter
- EnPhase M250-60-2LL-S22 Micro-Single
- Mounting system
- QuickMount
- Estimated first-year production
- 5,215 kWh
- Share of the home's electricity
- 89%
- Electric utility
- JCP&L
Solar questions from Bayville homeowners
Does a solar installation need permits in Bayville?
Yes. A permanently installed photovoltaic system normally requires construction permits under the New Jersey Uniform Construction Code. A residential project commonly involves electrical review, building and structural review, fire-access considerations and municipal inspections.
Does the utility have to approve the system?
Yes. A grid-connected residential array must receive utility interconnection approval before it can legally operate in parallel with the distribution system. New Jersey's interconnection requirements and the utility's own procedures both govern it.
Who receives the certificates on a purchased system?
A homeowner who owns a qualifying registered system can generally own the associated certificate rights, unless those rights have been assigned or sold under another agreement. The purchase contract and the programme registration documents should make that unambiguous.