Transfer Switch Retrofit in Parlin, NJ | New Switch on a 2012 Generator

Parlin, NJ · Client since May 2019

James from Parlin, NJ has been a Green Sun Energy Services client since May of 2019. His 8 kW Generac dates from 2012, and rather than replace a machine that still ran we retrofitted it with a new 100-amp automatic transfer switch. A switch is the part that decides what the generator can actually carry, and upgrading it is often the cheaper half of making an older unit useful again. A PowerBase plan has covered it since. Parlin is in Middlesex County.

Project Facts

Location
Parlin, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
May 2019
Rated output
8 kW LP / 7 kW NG
Scroll to Top