18 kW Standby Generator Installation in Atlantic Highlands, NJ | Whole-House Backup

Atlantic Highlands, NJ · Client since February 2021

David from Atlantic Highlands, NJ has been a Green Sun Energy Services client since February of 2021. The generator was commissioned in January of 2022: 18 kW on natural gas, on a 150-amp service-entrance switch with a smart management module, sized against a 13 kW calculation for the 2,295 square foot house. Eleven months separated the contract from the commissioning, which was the shape of generator work through that period – the permit, the utility gas connection and the equipment lead time all ran in sequence, and none moved faster for being chased. Two refrigerators, a washer, a gas dryer and a dishwasher make up the load, and the machine carries a comfortable margin over what the calculation required.

Project Facts

Location
Atlantic Highlands, NJ
Service
Standby Generator Installation
Client since
February 2021
Manufacturer
Generac Model # 7226
Rated output
18 kW LP / 17 kW NG
Fuel
Natural Gas
Home sized for
2,295 sq ft
Electrical service
150 amp
Transfer switch
150 amp
Load management
Managed Whole House

Standby generator questions from Atlantic Highlands homeowners

Does every generator need a valve adjustment?

No. Valve-clearance requirements depend on the engine and the model. The technician identifies the model and serial number and follows the applicable maintenance schedule, rather than assuming every air-cooled machine gets the same procedure.

How can a whole house be carried on a smaller electrical service?

Through load management. One or more large loads are controlled so they do not start at the same moment, or shut down briefly if generator demand climbs too high. That is what allows whole-house coverage where the raw sum of every connected load would otherwise exceed the machine.

Does new gas piping have to be pressure tested in Atlantic Highlands?

Yes. Gas piping subject to the adopted fuel-gas code must be inspected and tested before it is accepted. New Jersey adopts the 2024 International Fuel Gas Code, which governs the inspection, the test pressure and how long the test has to hold.