21 kW Standby Generator Installation in Shrewsbury, NJ | Whole-House Standby, A Second Generator After a Move

Shrewsbury, NJ · Client since April 2023

Joseph from Shrewsbury, NJ has been a Green Sun Energy Services client since April of 2023. This is a second generator rather than a first: one went in at the previous house in Middletown in 2020, and on moving here the household had another installed, this one on our top-tier plan with an annual visit, an extended parts-and-labor warranty and remote monitoring we manage directly. The Shrewsbury machine was commissioned that July, rated 21 kW on natural gas against a load calculation asking for 19 kW, with five load-management modules and a surge protective device on a 200-amp service. Three sump pumps sit on the load, which tells you what the ground under a 4,000 square foot house is doing. The Middletown installation is written up here.

Project Facts

Location
Shrewsbury, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
April 2023
Manufacturer
Generac Model # 7209
Rated output
24 kW LP / 21 kW NG
Fuel
Natural Gas
Home sized for
4,000 sq ft
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House

Standby generator questions from Shrewsbury homeowners

Does a propane generator need permits in Shrewsbury?

A permanently installed propane generator normally requires construction permits, and the propane installation has to satisfy the applicable fuel-gas and LP-gas requirements. Tank placement, capacity, piping, regulators, setbacks and fire-safety provisions all come under review.

Does a 200-amp service need a 200-amp transfer switch?

A transfer switch installed in the service path has to be rated appropriately for the service and the configuration. A 200-amp service commonly uses a 200-amp service-rated switch, but the actual design is confirmed by the electrician rather than assumed from the service size.

Does a generator need a concrete pad?

Not universally. Approved alternative support systems are permitted for applicable models. Concrete or an engineered platform may still be required because of the site conditions, flood requirements, anchoring, municipal requirements or structural design -- but it is not automatic.