Susan from Bridgewater, NJ has been a Green Sun Energy Services client since May of 2024. The job was a removal: 46 panels totalling 10.35 kW taken off the roof, along with the mounting system, the inverters, the disconnects, the exterior conduit and wiring and the meters, all removed and disposed of, completed on 29 May. The flashing and lag bolts were deliberately left in place for the roofer to take out. That is not an oversight but the safer sequence – every bolt drawn out of a deck is a hole that has to be sealed, so leaving them for the crew who will be stripping the roof anyway means they are dealt with once rather than twice. The household had its own roofer for the work that followed, so ours ended at the removal.
Project Facts
- Location
- Bridgewater, NJ
- Service
- Solar Removal/Replacement
- Client since
- May 2024