Solar Panel Installation in Matawan, NJ | 66 Panels and 22.44 kW for a Business

Matawan, NJ · Client since September 2017

Grounds Keeper, Inc. in Matawan, NJ has been a Green Sun Energy Services client since September of 2017. The array was completed in February of 2018: 66 panels making 22.44 kW into two SolarEdge three-phase inverters, and an estimated 25,195 kilowatt hours in the first year. JCP&L interconnected it in March. This is a commercial installation rather than a residential one, and two things follow from that: the inverters are three-phase because the building’s supply is, and the flat roof was coated rather than stripped and re-shingled – a different preparation entirely, and the right one for the surface involved. At over twenty-two kilowatts it remains among the largest arrays we have built.

Project Facts

Location
Matawan, NJ
Service
Solar Panel Installation
Client since
September 2017
Panels
Hansol Model # TDN-340
Panels
66
System size
22.44 kW
Inverter
SolarEdge 2 X SE9KUS-208 (3 Phase)
Mounting system
IronRidge/OMG
Estimated first-year production
25,195 kWh
Share of the home's electricity
38%
Electric utility
JCP&L

Solar questions from Matawan homeowners

Can the system be switched on before the utility approves it?

A grid-connected system should not be placed into normal parallel operation until the utility has issued the required authorisation. Running it beforehand can breach the interconnection agreement and the utility's requirements.

Are panels designed for the wind near Matawan?

Yes. The array and its mounting system have to be designed to resist the applicable wind loads, and coastal and exposed locations can carry different wind-design conditions from sheltered inland ones. It is one of the reasons the mounting system and its engineering are chosen for the site rather than by habit.

Can future electricity use be counted when sizing the array?

Potentially, particularly where the household expects documented new loads such as an EV, a heat pump or another electrification project. The utility's interconnection requirements decide what documentation and load assumptions are acceptable, so an installer should not simply oversize the system and hope for approval.