A 10 kW Essential-Circuits Generator Since 2013

Tinton Falls, NJ · Client since November 2012

Donna from Tinton Falls, NJ has been a Green Sun Energy Services client since November of 2012, which makes this among the oldest relationships on the site. The generator was commissioned in February of 2013: 10 kW on natural gas, feeding a twelve-circuit switch rather than the whole house – named circuits carried, with two refrigerators among them, across an 800 square foot property. Essential circuits is the approach that suits a small property with a modest requirement: the calculation came to 2 kW, and a ten-kilowatt machine covers the named circuits many times over without anybody paying for capacity the house will never draw. Thirteen years later an annual maintenance plan still covers it.

Project Facts

Location
Tinton Falls, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
November 2012
Manufacturer
Generac Model # 5871
Rated output
10 kW LP / 9 kW NG
Fuel
Natural Gas
Electrical service
200 amp
Transfer switch
0 amp
Load management
Dedicated (Essential) Circuits
Scroll to Top