Hojong from Marlboro, NJ has been a Green Sun Energy Services client since September of 2023, when we installed a ChargePoint Level 2 charger at the house. A Level 2 unit on a dedicated circuit is what turns overnight charging into a solved problem rather than a nightly calculation. The install is as much an electrical job as an equipment one: the circuit has to be sized properly and the panel has to have room for it. Marlboro is in Monmouth County, where a good share of the driveways now have something plugged into them.
Project Facts
- Location
- Marlboro, NJ
- Client since
- September 2023
Great service, quick installation and very attentive.
Green Sun Energy Services replied
Thank you, Hojong. A Level 2 ChargePoint charger in Marlboro is a straightforward install when the panel cooperates and a careful one when it does not, so we would rather take the time up front than leave you with a circuit that trips. Glad the work was quick and that someone stayed attentive throughout.
