Dale from Farmingdale, NJ has been a Green Sun Energy Services client since December of 2016. He signed in early December and the generator was commissioned at the end of January, a 16 kW Generac in an aluminium enclosure on its own pad, wired through a 200-amp service-rated transfer switch. The house is 1,600 square feet with an electric dryer and an electric oven, and those two together are why the rating sits above what the floor area alone would call for. Farmingdale is in Monmouth County.
