Robin from Holmdel, NJ has been a Green Sun Energy Services client since November of 2018. Her 20 kW Generac was installed by another company in December of 2013 and she brought the servicing to us five years later on a Bronze plan. Bronze is the call-us-when-you-need-us arrangement rather than a booked annual visit, which suits an owner who would rather ring when something is wrong than keep a date in the calendar. Holmdel is in Monmouth County.
Why Robin chose Green Sun Energy Services
We keep your generator ready before the power goes out.
What makes Green Sun Energy Services different
- Standby generators: installed and serviced as a Generac Authorized Sales and Service Dealer, by factory-authorized Generac technicians. On this home: a standby generator serviced by Green Sun Energy Services.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 711 completed generator service projects across Monmouth County and 939 generator service projects throughout New Jersey.
Our work in Holmdel
Green Sun Energy Services has completed 42 generator service customers in Holmdel. Holmdel, a township in Monmouth County, is served by JCP&L.
Thinking about generator service for your Holmdel home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Holmdel, NJ
- Service
- Standby Generator Service
- Client since
- November 2018
- Manufacturer & model
- Generac 5887
- Rated output
- 20 kW LP / 18 kW NG
- Transfer switch
- 90 amp
- Load management
- Managed Whole House
Standby generator questions from Holmdel homeowners
What happens if the manufacturer and Holmdel disagree?
The installation has to satisfy all applicable requirements. A manufacturer's listing cannot be ignored, and a manufacturer's minimum clearance does not cancel a municipal zoning requirement. Where requirements conflict or the interpretation is uncertain, the Authority Having Jurisdiction is consulted before the work goes in rather than after.
What does the automatic transfer switch do?
It moves the home's electrical supply between the utility and the generator. That is what lets the system work automatically, and it is also what prevents the house being connected to both sources at once. It is the piece that makes the rest safe.
How much space is needed at the ends of the generator?
Applicable air-cooled installation instructions commonly require about three feet at the ends. That space protects cooling airflow, exhaust operation and the access a technician needs to work on the machine. The model-specific manual controls.
