Bassil from Little Falls, NJ has been a Green Sun Energy Services client since May of 2015. He signed in the middle of May and the array was producing by the middle of October, 26 LG 300 watt panels on Enphase M250 microinverters with QuickMount racking. At 7.8 kW it was designed for about 8,603 kWh a year. Little Falls is in Passaic County, at the northern end of where we install.
Project Facts
- Location
- Little Falls, NJ
- Service
- Solar Panel Installation
- Client since
- May 2015
- Panels
- LG Model # 300N1C-G3/35mm
- Panels
- 26
- System size
- 7.80 kW
- Inverter
- EnPhase M250-60-2LL-S22 Micro-Single
- Mounting system
- QuickMount
- Estimated first-year production
- 8,603 kWh
- Electric utility
- PSE&G
Solar questions from Little Falls homeowners
Which utility handles interconnection in Little Falls?
The electric distribution company that serves the property. In New Jersey that is Jersey Central Power & Light, PSE&G, Atlantic City Electric or Rockland Electric depending on the address, and municipal electric systems can have their own requirements.
What happens when the panels make more than the house is using?
The surplus flows out through the meter to the grid and creates a net-metering credit, which can offset electricity drawn from the grid at another point in the billing period or later in the annualised period.
Can the old mounting hardware be reused after a reroof?
It depends on the manufacturer's requirements, the condition of the components and the warranty. The roof penetrations and weatherproofing components matter most, and a reroof is often the moment to replace the attachment and flashing rather than reinstall ageing roof-interface hardware.
