Solar Panel Installation in Matawan, NJ | 5 kW Array with 20 Trina Panels

Matawan, NJ · Client since January 2014

Ronald from Matawan, NJ has been a Green Sun Energy Services client since January of 2014. He signed in the middle of January and the array was producing by the ninth of April, 20 Trina 250 watt panels on Enphase M215 microinverters with Zep II mounting. At 5 kW it was designed for about 5,468 kWh a year. A microinverter behind each panel means one shaded module slows itself rather than the whole string. Matawan is in Monmouth County.

Why Ronald chose Green Sun Energy Services

More than solar panels: a professionally managed energy system, from design and permitting through installation, inspection, activation and ongoing support.

What makes Green Sun Energy Services different

  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with Enphase microinverters on every panel so each one reports its own output. On this home: a 5 kW solar array of 20 Trina TMS-PC05/PA05.18/250W panels, an EnPhase M215-60-2LL-S22-IG Micro-Single inverter and the Zep Solar mounting system.
  • Warranty: backed by a 5-year solar workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 138 completed solar projects across Monmouth County and 361 solar projects throughout New Jersey.

Our work in Matawan

Green Sun Energy Services has completed 5 featured solar projects in Matawan. Matawan, a borough in Monmouth County, is served by JCP&L.

Generate electricity on your roof and use it to help power your vehicle.

Thinking about solar for your Matawan home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Matawan, NJ
Service
Solar Panel Installation
Client since
January 2014
Manufacturer & model
Trina TMS-PC05/PA05.18/250W
Panels
20
System size
5.00 kW
Inverter
EnPhase M215-60-2LL-S22-IG Micro-Single
Mounting system
Zep Solar
Estimated first-year production
5,468 kWh
Electric utility
JCP&L
Workmanship warranty
5 years

Solar questions from Matawan homeowners

Can the system be switched on before the utility approves it?

A grid-connected system should not be placed into normal parallel operation until the utility has issued the required authorisation. Running it beforehand can breach the interconnection agreement and the utility's requirements.

What makes a good solar panel?

For most homeowners it is a high-quality residential module with strong efficiency, a low degradation rate, and product and performance warranties, that fits the roof geometry available. Efficiency, wattage, temperature coefficient, mechanical-load rating, hail testing and the manufacturer's financial stability are all worth comparing.

Does Matawan decide whether the installation is code-compliant?

The municipal construction department reviews and inspects the work under the Uniform Construction Code, but the substantive electrical requirements come from the statewide Electrical Subcode rather than from local preference. Municipalities may also administer zoning requirements where those apply.

Scroll to Top