Alex from Robbinsville, NJ has been a Green Sun Energy Services client since August of 2015. He and Megan signed at the end of August and the array was producing by the twenty-first of November, 30 LG 300 watt panels on Enphase M250 microinverters with QuickMount racking. At 9 kW it was designed for about 9,738 kWh a year. Robbinsville is in Mercer County.
Why Alex chose Green Sun Energy Services
More than solar panels: a professionally managed energy system, from design and permitting through installation, inspection, activation and ongoing support.
What makes Green Sun Energy Services different
- Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with Enphase microinverters on every panel so each one reports its own output. On this home: a 9 kW solar array of 30 LG 300N1C-G3/35mm panels, an EnPhase M250-60-2LL-S22 Micro-Single inverter and the QuickMount mounting system.
- Warranty: backed by a 5-year solar workmanship warranty.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 25 completed solar projects across Mercer County and 363 solar projects throughout New Jersey.
Our work in Robbinsville
Green Sun Energy Services has completed 2 featured solar projects in Robbinsville. Robbinsville, a township in Mercer County, is served partly by JCP&L and partly by PSE&G.
Generate electricity on your roof and use it to help power your vehicle.
Thinking about solar for your Robbinsville home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Robbinsville, NJ
- Service
- Solar Panel Installation
- Client since
- August 2015
- Manufacturer & model
- LG 300N1C-G3/35mm
- Panels
- 30
- System size
- 9.00 kW
- Inverter
- EnPhase M250-60-2LL-S22 Micro-Single
- Mounting system
- QuickMount
- Estimated first-year production
- 9,738 kWh
- Electric utility
- PSE&G
- Workmanship warranty
- 5 years
Solar questions from Robbinsville homeowners
Do solar panels produce anything on a cloudy day?
Yes, though normally less than under strong direct sun. Modules convert both direct and diffuse light. It is the reason a solar proposal should be judged on annual production rather than on any promise about what happens on a given day.
How is the number of panels for a Robbinsville house decided?
It starts with the home's actual electricity use, then with how much usable roof or ground area there is. A proper design looks at twelve months of consumption, expected future use, roof orientation, shading, roof dimensions, code-required setbacks, module wattage and the limits the utility places on interconnection.
Who maintains a leased solar system?
The third-party owner generally takes on significant equipment-maintenance responsibility under a lease or power purchase agreement, but the actual obligations come from the contract. Worth checking specifically: inverter failure, panel failure, monitoring, labor, roof removal, animal damage, storm damage and production shortfalls.