Justin from Bridgewater, NJ has been a Green Sun Energy Services client since May of 2022. Nineteen existing solar panels – 4.37 kW in all – came off the roof that October and went back on, reusing the original rail-free mounting system with new flashing at every point where the hardware meets the roof. That last part is the whole job: the panels and the rails were fine, and the flashing is what keeps water out, so renewing it while everything is off the roof is the one chance to replace the part that ages fastest.
Project Facts
- Location
- Bridgewater, NJ
- Service
- Solar Removal/Replacement
- Client since
- May 2022
