Standby Generator Installation in Belle Mead, NJ | A 16 kW Generac, Client Since 2019

Belle Mead, NJ · Client since September 2019

Bernard and Carol from Belle Mead, NJ have been Green Sun Energy Services clients since September of 2019. The machine is a Generac 7035-1 rated 16 kW on natural gas, on a 150-amp transfer switch, and it was commissioned in December of 2019. At about 1,596 square feet the house sits well inside what 16 kW carries, so the switch takes the panel whole. Green Sun carried out its scheduled maintenance in December of 2020, November of 2021, January of 2023, December of 2023 and November of 2024 – always before the winter, on the same machine.

Project Facts

Location
Belle Mead, NJ
Service
Standby Generator Installation
Client since
September 2019
Manufacturer
Generac Model # 70351
Rated output
16 kW LP / 16 kW NG
Fuel
Natural Gas
Home sized for
1,596 sq ft
Electrical service
150 amp
Transfer switch
150 amp
Load management
Managed Whole House

Standby generator questions from Belle Mead homeowners

Does a generator in Belle Mead have to sit twelve inches above the flood elevation?

That figure should not be treated as a universal rule without looking at the actual property. The required elevation can depend on the flood-zone designation, the municipal freeboard, the Design Flood Elevation, Coastal A or V Zone conditions, NJDEP requirements and the applicable building-code provisions. Each flood-zone installation is worked out individually.

What does a standby generator sit on?

A stable, level support system allowed by the model's installation instructions. Depending on the machine and the site that can be an approved composite base, a prepared aggregate base, a concrete pad, or an engineered elevated platform.

Can an existing propane tank be reused for a new generator?

Possibly. Existing propane equipment can be reused when it is correctly sized, sited, regulated, maintained and capable of supplying the demand the generator adds. The propane supplier should verify capacity and regulator performance before the machine is commissioned rather than after.