Michael from Tinton Falls, NJ has been a Green Sun Energy Services client since July of 2019. The 11 kW standby generator at the house was installed by another company in June of 2018, and Michael brought its servicing to us within the year, while the machine was barely twelve months old. Every interval since has been done in sequence and none has been missed — the one-year check through to the eight-year, completed in March of 2026 with 273.6 hours on the meter and the fuel plenum inspected and clear of rust. Two hundred and seventy-three hours on an 11 kW unit is heavy use by any measure, and a machine worked that hard with a service record without a single gap is about as good a position as a homeowner can be in.
