19.5 kW Standby Generator Installation in Red Bank, NJ | Whole-House Standby, Commissioned Ahead of Winter

Red Bank, NJ · Client since August 2020

Elaine from Red Bank, NJ has been a Green Sun Energy Services client since August of 2020. The generator was commissioned that November, ahead of the winter it was bought for, rated 19.5 kW on natural gas where the load calculation asked for 15 kW. The transfer switch matches the full 200-amp service, so the house moves across whole rather than in part. Elaine and Derek hold our top-tier plan on it: an annual service visit, an extended parts-and-labor warranty and remote monitoring we manage directly, which means a fault surfaces between visits rather than at the worst moment.

Project Facts

Location
Red Bank, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
August 2020
Manufacturer
Generac Model # 7043-2
Rated output
22 kW LP / 19.5 kW NG
Fuel
Natural Gas
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House

Standby generator questions from Red Bank homeowners

Can a generator be installed on a deck or a roof?

Platform, deck and supporting-structure installations are recognized, but they call for additional review: structural capacity, noncombustible surface requirements, fire clearance, exhaust, airflow, vibration, service access and local requirements all have to be addressed. It is a site-specific installation rather than a routine location.

How is the gas pipe size worked out?

From the generator's demand, the available pressure, the pipe length, the allowable pressure drop, the fittings, the pipe material and every other appliance connected to the system. The adopted fuel-gas code carries the sizing requirements and tables, and the model's published fuel consumption goes into the calculation.

How can a whole house be carried on a smaller electrical service?

Through load management. One or more large loads are controlled so they do not start at the same moment, or shut down briefly if generator demand climbs too high. That is what allows whole-house coverage where the raw sum of every connected load would otherwise exceed the machine.