22 kW Standby Generator Installation in Middletown, NJ | Sized for 5,000 Square Feet on a 200-Amp Switch

Middletown, NJ · Client since August 2020

Christine from Middletown, NJ has been a Green Sun Energy Services client since August of 2020. A Generac Guardian rated 22 kW on propane and 19.5 kW on natural gas went in that October, running on natural gas behind a 200-amp automatic transfer switch. The load survey put 5,000 square feet of living space behind it, which is what puts the machine at the top of the air-cooled range rather than in the middle of it – and with the switch sized to the whole service, an outage takes nothing off the table.

Project Facts

Location
Middletown, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
August 2020
Manufacturer
Generac Model # 7043-2
Rated output
22 kW LP / 19.5 kW NG
Fuel
Natural Gas
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House

Standby generator questions from Middletown homeowners

Does a generator in Middletown have to sit twelve inches above the flood elevation?

That figure should not be treated as a universal rule without looking at the actual property. The required elevation can depend on the flood-zone designation, the municipal freeboard, the Design Flood Elevation, Coastal A or V Zone conditions, NJDEP requirements and the applicable building-code provisions. Each flood-zone installation is worked out individually.

Can the generator stay connected during a pressure test?

The machine has to be protected from test pressures beyond what its fuel controls are built to withstand. The fuel-gas code sets out when appliances are disconnected or isolated for testing, and the plumbing contractor follows both that code and the generator's installation instructions.

Can a standby generator run central air conditioning?

Yes, when it is sized for it. The design has to account for both the running demand and the starting surge of the air-conditioning equipment. Load-management equipment can be used where necessary so that demand does not all arrive at once.