Solar Panel Installation and Roofing Installation in Hampton, NJ | 65 Panels Off and Back On a New Roof
Vincent Campbell has been a Green Sun Energy Services client since April of 2026, when a new roof and the removal and reinstallation of an existing solar array were booked together. The roof was finished on 17 June 2026. 2,500 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along 207 feet of rakes, eaves and valleys, and a ridge vent along the peak.
