Fred Lahser has been a Green Sun Energy Services client since June of 2017, when a new roof and the removal and reinstallation of an existing solar array were booked together. The roof was finished on 30 August 2017.
Two layers off, 2,600 square feet on
This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 234 feet of rakes, eaves and valleys, and a ridge vent along the peak.
14 panels down and back up
The array is a compact one: fourteen panels at 255 watts, 3.57 kW in total, on QuickMount flashed mounts with an Enphase M215 microinverter behind each panel. All of it came off for the roof and all of it went back.
An array whose electronics live on the roof
The M215 is an early-generation microinverter, and like every microinverter it sits underneath its own panel rather than in a box on the wall. That is the design’s great advantage in ordinary use — each panel performs on its own, and shade or a fault on one takes only that one out of the day — and it is what makes a reset different from resetting a string array. Fourteen panels came off and fourteen sets of electronics came off with them, were handled, and went back. On a string system the inverter would never have left the wall.
Why a roof under an array gets done properly or not at all
An array is fastened down for decades and the roof beneath it has to outlast it, or the whole exercise repeats. Here the shingles had been covered over once and had reached the end; the panels had not. The order that made sense was down, two layers off, new roof, back up — and the array now sits on a deck that was stripped, seen and covered new, with a 50-year system under it rather than the second-hand roof it spent its first years on.
Why Springfield homeowners choose Green Sun Energy Services
One company removes the solar, fixes the roof, corrects what is underneath and puts everything back right.
What makes Green Sun Energy Services different
- Roofing: installed as a GAF Certified Roofing Contractor (#CE28608), with a GAF Timberline Lifetime Roofing System like the one on this home. On this home: a new roof over 2,600 sq ft.
- Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148). On this home: a solar array and the panels removed and reinstalled.
- Warranty: backed by a 50-year roof warranty and a 5-year roofing workmanship warranty.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 10 completed roofing projects and 20 completed solar projects across Union County and 91 roofing projects and 360 solar projects throughout New Jersey.
Our work in Springfield
Springfield, a township in Union County, is served by JCP&L.
Generate electricity on your roof and use it to help power your vehicle.
Thinking about a new roof, solar, or both for your Springfield home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Springfield, NJ
- Services
- Roofing Installation, Solar Removal/Replacement
- Client since
- June 2017
- System
- GAF Timberline Lifetime Roofing System
- Area replaced
- 2,600 sq ft
- Warranty
- 50 years
- Workmanship warranty
- 5 years
Questions from Springfield homeowners
RoofingDoes a Springfield roofing contractor need to be registered with the State?
A business performing residential roofing in New Jersey generally falls under the Home Improvement Contractor Business registration requirements unless an exemption applies. Homeowners should verify that the company has a current New Jersey home-improvement registration and appropriate insurance before signing a contract.
RoofingWhat is an architectural shingle?
A laminated shingle built up in layers to give the roof dimension and shadow rather than the flat appearance of a traditional three-tab. The laminated construction is also what carries the manufacturer's bonding and nailing technologies, so the difference is not only how it looks.
RoofingShould new solar mounting hardware be used when a roof is replaced?
New roof-interface and mounting components are often advisable, because they create a newly flashed mounting system rather than depending on aging penetrations or attachment components. The mounting-system manufacturer's instructions ultimately control whether existing parts can be reused.
SolarDoes the electric meter get changed?
The utility has to provide metering capable of properly measuring the electricity delivered to and received from a net-metered customer. Which meter that is, and how it gets swapped, varies by utility.
SolarDo solar panels produce anything on a cloudy day?
Yes, though normally less than under strong direct sun. Modules convert both direct and diffuse light. It is the reason a solar proposal should be judged on annual production rather than on any promise about what happens on a given day.
