Roofing Installation

Roofing and Solar Panel Installation in Hillsborough, NJ | A 3,500 Square Foot Roof and 8.74 kW

Paul from Hillsborough, NJ has been a Green Sun Energy Services client since May of 2024. Both jobs were booked in the same week and finished eight days apart that summer, which is the sequence that makes the pair worth doing together. A 3,500 square foot roof: The roof came off and went back on at the end of July of 2024, 3,500 square feet in the GAF Timberline system, with 266 feet of rakes, eaves and valleys detailed as part of the work. Those edges are where a roof usually gives way first, because water tracks back under a […]

Roofing and Solar Panel Installation in Green Brook, NJ | A New Roof, Then 8.91 kW

Megan and David from Green Brook, NJ have been Green Sun Energy Services clients since December of 2023. Roof and array were signed on the same day and built two weeks apart, roof first. A new roof: GAF Timberline Lifetime shingle, finished in February of 2024, taking in 222 feet of rakes, eaves and valleys – the edges and the water channels, where the ice-and-water membrane goes. 8.91 kW of solar: Twenty-two Qcells 405-watt panels on a Snap-N-Rack mounting system, finished in March of 2024, with first-year production estimated at 8,726 kWh. The job took in 120 feet of critter

Roofing and Solar Panel Installation in Burlington Township, NJ | A New Roof in 2020, 9.6 kW in 2023

Steven from Burlington Township, NJ has been a Green Sun Energy Services client since June of 2020. Two jobs three years apart, in the order that saves the second one. A new roof: About 2,900 square feet of GAF Timberline Lifetime shingle, finished in June of 2020, taking in 282 feet of rakes, eaves and valleys – the edges and the water channels, where a roof leaks first. 9.6 kW of solar: Twenty-four Hanwha Q CELLS 400-watt black-frame panels on a Snap-N-Rack mounting system, finished in July of 2023, with first-year production estimated at 13,431 kWh. The job took in

Roofing and Solar Panel Installation in Cherry Hill, NJ | A New Roof, Then 8.88 kW

Peter from Cherry Hill, NJ has been a Green Sun Energy Services client since September of 2020. Roof and array were bought on the same day and built in the right order. A new roof: About 2,700 square feet of GAF Timberline Lifetime shingle, finished in November of 2020, taking in 248 feet of rakes, eaves and valleys – the edges and the water channels, where the ice-and-water membrane goes and where a roof leaks first. 8.88 kW of solar: Twenty-four Solaria 370-watt panels on an Ecolibrium Solar mounting system, finished at the end of November, with first-year production estimated

Roofing and Solar Panel Installation in Belford, NJ | A New Roof, Then 12.9 kW

Andrew from Belford, NJ has been a Green Sun Energy Services client since August of 2025. Both jobs were signed on the same day and built six days apart, roof first. A new roof: GAF Timberline Lifetime shingle, finished in September of 2025, taking in 280 feet of rakes, eaves and valleys. On a house this close to the bay the edges are the part that decides how a roof handles wind-driven rain, which is where the ice-and-water membrane goes. 12.9 kW of solar: Thirty Jinko 430-watt panels on IronRidge rail, finished at the end of September, with first-year production

Solar Panel Installation and Roofing in Monroe Township, NJ | 9.49 kW on a New Roof

Sean from Monroe Township, NJ has been a Green Sun Energy Services client since June of 2021. The roof and the array were sold a day apart and built a week apart, roof first. A new roof: About 4,400 square feet of GAF Timberline Lifetime shingle, stripped and replaced in September of 2021, taking in 370 feet of rakes, eaves and valleys. That is a large roof by any measure, and the edge footage is the part that decides how it handles driven rain and ice at the gutter line. 9.49 kW of solar: Twenty-six LG 365-watt panels on an

Roofing and Solar Panel Installation in Mystic Islands, NJ | 9.315 kW on a New Roof

Enrico from Mystic Islands, NJ has been a Green Sun Energy Services client since October of 2023. Both jobs were sold on the same day and built five weeks apart, roof first. A new roof: About 2,800 square feet of GAF Timberline Lifetime shingle, finished in November of 2023, taking in 231 feet of rakes, eaves and valleys. On a barrier-island house the edges are the part that matters most: that is where wind gets under a shingle course and where driven rain finds its way in. 9.315 kW of solar: Twenty-three Qcells 405-watt panels on a Snap-N-Rack mounting system,

Solar Panel Installation and Roofing in Holmdel, NJ | A New Roof, Then 11.1 kW

Jennie from Holmdel, NJ has been a Green Sun Energy Services client since April of 2022. The roof and the array were bought together and built in the right order – the roof first, then the panels onto it. A new roof: About 3,200 square feet of GAF Timberline Lifetime shingle, stripped and replaced in June of 2022, taking in 349 feet of rakes, eaves and valleys. Those are the edges and the water channels, and they are where the ice-and-water membrane has to go. 11.1 kW of solar: Thirty REC 370-watt panels on a Snap-N-Rack mounting system, finished in

Roof Replacement in Somerset, NJ | 4,000 Square Feet of GAF Timberline

Ela from Somerset, NJ has been a Green Sun Energy Services client since August of 2020. The roof is about 4,000 square feet and was stripped and replaced with the GAF Timberline Lifetime system in August of 2020. The job took in 421 feet of rakes, eaves and valleys – the edges and the water channels, which are where a roof leaks first and where the ice-and-water membrane has to go. A tear-off of that size is a two-day job done properly, and the decking underneath only shows what it is once the old layer is off.

Solar Panel Installation in Atlantic Highlands, NJ | 8.28 kW and 140 Feet of Critter Guard

Bojan from Atlantic Highlands, NJ has been a Green Sun Energy Services client since May of 2022. The array is 8.28 kW – 23 REC 360-watt black-frame panels on a Snap-N-Rack mounting system – and it was finished in August of 2022. First-year production was estimated at 9,780 kWh. The job also included 140 feet of critter guard around the perimeter. That is the mesh that closes the gap between the panels and the roof, and on a house this close to the water it is worth doing at install rather than after something has already nested under there.