Solar Panel Installation and Roofing Installation in Ship Bottom, NJ | 26 Panels
Simon Skinner has been a Green Sun Energy Services client since October of 2017, when the solar array was signed and the roof followed a month later. The roof was finished on 22 November 2017 and the array on 15 December. 1,600 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 132 feet of rakes and eaves, and a ridge vent along the peak. What […]
