Roofing Installation

Replacing a roof with solar on it is a different job from replacing one without, and we do both. These are roofs we installed at New Jersey homes, with the system that went on, the area it covers and the town. Some are houses where the array came off, the roof went on and the array went back, which is a day nobody wants to repeat.

91 completed roofing projects across 64 New Jersey towns, including 18 with a review written by the customer.

Solar Panel Installation and Roofing Installation in Port Monmouth, NJ | Under an Existing Array

Fred Cannock has been a Green Sun Energy Services client since July of 2024, when the removal and reinstallation of an existing solar array was booked alongside a new roof. The roof was finished on 14 August 2024 and the panels were back on by 3 October. Two layers off, 1,800 square feet on: This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along […]

Solar Panel Installation and Roofing Installation in South Bound Brook, NJ | 24 Panels Off, 14 New Ones On

James Sickoria has been a Green Sun Energy Services client since May of 2023, when a partial solar removal, a new roof and a new array were booked as one job. The roof was finished on 5 June 2023 and the new panels went on that July. Critter guard followed in May of 2026. Only the back of the house was touched: This is the least common shape of job on the site and the notes set it out precisely: the twenty-four panels on the back of the house came off, along with the two inverters that ran them, and

Solar Panel Installation and Roofing Installation in Hampton, NJ | 65 Panels Off and Back On a New Roof

Vincent Campbell has been a Green Sun Energy Services client since April of 2026, when a new roof and the removal and reinstallation of an existing solar array were booked together. The roof was finished on 17 June 2026. 2,500 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along 207 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Solar Panel Installation and Roofing Installation in Franklin Park, NJ | 36 All-Black Panels

Sherjeel Yaqoob has been a Green Sun Energy Services client since June of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 7 September 2019 and the array ten days later. 3,600 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 316 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Solar Panel Installation and Roofing Installation in Fords, NJ | 22 Panels

Akash Patel came to Green Sun Energy Services as a referral and has been a client since May of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 13 July 2019 and the panels went on four days later. 3,000 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 273 feet of rakes, eaves and

Solar Panel Installation and Roofing Installation in East Brunswick, NJ | Our Own Array Off and Back On

HsiaoChung Huang has been a Green Sun Energy Services client since June of 2019, when we installed an 18-panel array. Two years later the roof underneath it reached the end of its life, so the same array came off, the roof was replaced, and the panels went back. 18 panels and 6.03 kW, in 2019: Eighteen LG 335 watt panels came to 6.03 kW on rail-free mounting, finished on 12 August 2019, running into a SolarEdge SE5000H HD Wave inverter with an optimizer on every panel. Critter guard went on at the same time — 116 feet of mesh around

Solar Panel Installation and Roofing Installation in Ringwood, NJ | A New Roof, Then 38 Panels

Jeremy Munck has been a Green Sun Energy Services client since June of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 19 July 2019 and the array in the middle of August. 3,600 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 338 feet of rakes, eaves and valleys, and a ridge vent along

Solar, Generator and New Roof in Manalapan, NJ | All Three Since 2019

Evan from Manalapan, NJ has been a Green Sun Energy Services client since May of 2019. He and Rachel bought the array and the generator within a fortnight of each other and both went live in the first week of August; the roof followed a year later. 36 panels and 11.7 kW: Live on 5 August 2019: 36 Hanwha Q.PEAK DUO 325-watt modules on a SolarEdge inverter, 11.7 kW rated, estimated at 12,302 kilowatt hours in the first year. The inverter is deliberately oversized against the array rather than matched to it, which costs a little at the outset and

Solar Panel Installation and Roofing Installation in Belford, NJ | 39 Panels

Mike McCusker has been a Green Sun Energy Services client since March of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 18 April 2019 and the array a month later. 2,000 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 269 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Solar Panel Installation and Roofing Installation in Berkeley Heights, NJ | Two Layers Off and 21 Panels On

Michael Hartman has been a Green Sun Energy Services client since March of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 11 May 2019 and the array six days later. Two layers off, 2,400 square feet on: This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty and aluminum drip edge along 345 feet of rakes, eaves and valleys.

Solar Panel Installation and Roofing Installation in Freehold, NJ | 40 Panels

Anthony Vazzana has been a Green Sun Energy Services client since April of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 25 May 2019 and the array a week later. 5,300 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 374 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Solar Panel Installation and Roofing Installation in Hillsborough, NJ | 43 Panels

Dale Roberts has been a Green Sun Energy Services client since September of 2018, when the roof and the solar array were bought on the same day. The roof was finished on 22 December 2018 and the array in the middle of the following January. 4,800 square feet, stripped to the deck: The old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline system carrying a 50-year warranty, aluminum drip edge along 420 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Scroll to Top