Roofing Installation

Replacing a roof with solar on it is a different job from replacing one without, and we do both. These are roofs we installed at New Jersey homes, with the system that went on, the area it covers and the town. Some are houses where the array came off, the roof went on and the array went back, which is a day nobody wants to repeat.

91 completed roofing projects across 64 New Jersey towns, including 18 with a review written by the customer.

Solar, Roofing and EV Charger Installation in Califon, NJ | 27 Panels and a Charger

Mitchell from Califon, NJ has been a Green Sun Energy Services client since September of 2025, and the whole of it – roof, array and car charger – was done inside eight days that October. 1,300 square feet of new roof: Finished on 24 October. A single layer stripped to the sheathing and carted away rather than covered over, then 1,300 square feet of GAF Timberline HDZ in charcoal, warranted fifty years, with continuous soffit vents at the intake. 27 panels and 11.75 kW: Five days later, on 29 October: 27 Hyundai 435-watt modules with Enphase IQ8PLUS microinverters, rail-mounted, split […]

Solar Panel Installation and Roofing Installation in Brick, NJ | Two Layers Off and 36 Panels

Conor Egan has been a Green Sun Energy Services client since August of 2021, when the roof and the solar array were bought on the same day. The roof was finished on 23 April 2022 and the array a month later. Two layers off, 3,300 square feet on: This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one — twice the tear-off, twice the disposal, and the only way anyone sees the deck before an array is fastened to it. Deck protection went over the exposed sheathing,

Solar Panel Installation and Roofing Installation in Red Bank, NJ | A Skylight and 18 Panels

Brandon Dennis has been a Green Sun Energy Services client since May of 2022. The array was signed on the 30th and the roof the following day. The roof was finished on 10 June 2022 and the panels went on in August. 2,300 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along 233 feet of rakes and eaves, and a ridge vent along

Solar Panel Installation and Roofing Installation in Little Egg Harbor, NJ | 34 Panels

Jeffrey Cushman has been a Green Sun Energy Services client since March of 2021, when the roof and the solar array were bought on the same day. The roof was finished on 12 July 2021 and the array nine days later. 4,000 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Pewter Grey carrying a 50-year warranty, aluminum drip edge along 353 feet of rakes, eaves and valleys, and a ridge vent

Solar Panel Installation and Roofing Installation in Piscataway, NJ | Two Layers Off and 22 Panels the Next Day

Tyrone Crews has been a Green Sun Energy Services client since June of 2022, when the array was signed and the roof followed five days later. The roof was finished on 31 August 2022 and the panels went on the following morning. Two layers off, 2,300 square feet on: This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along 204 feet of rakes and

Solar Panel Installation and Roofing Installation in Lincroft, NJ | 25 All-Black Panels

Kenneth Cinque has been a Green Sun Energy Services client since January of 2020, when the roof and the solar array were bought on the same day. The roof went on first and the panels followed, both in the early spring of that year. 3,600 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 338 feet of rakes, eaves and valleys, and a ridge vent

Solar Panel Installation and Roofing Installation in Rahway, NJ | 15 South-Facing Panels

Gordon Carson has been a Green Sun Energy Services client since December of 2020, when the roof and the solar array were bought on the same day. The roof was finished nine days later, on 15 December 2020, and the array the following March. 2,300 square feet, stripped back to the planks: The old shingles came off down to bare wood planks rather than plywood, which places this house in an older generation of building. Deck protection went over the exposed boards, then a GAF Timberline HDZ system in Fox Hollow Gray carrying a 50-year warranty, aluminum drip edge along

Solar Panel Installation and Roofing Installation in Branchburg, NJ | 28 Panels Removed and 6,400 Square Feet of Roof

Kerry Camerer has been a Green Sun Energy Services client since December of 2023, when a new roof and the removal of an existing solar array were booked together. The roof was finished on 4 January 2024. 28 panels off, and not put back: The array here was 6.3 kW across 28 panels — 225 watts apiece, which places it in an earlier generation of modules. It came off as a removal rather than a lift and reset: panels, mounting system, inverters, disconnects, the exterior conduit and wiring and the meters, all away. The flashings and lag bolts were deliberately

Solar Panel Installation and Roofing Installation in Wall, NJ | 26 South-Southwest Panels

Antonella Benedetto has been a Green Sun Energy Services client since August of 2022, when the roof and the solar array were bought on the same day. The roof was finished on 14 October 2022 and the array a week later. 4,100 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Charcoal carrying a 50-year warranty, aluminum drip edge along 316 feet of rakes, eaves and valleys, and a ridge vent along

Solar Panel Installation and Roofing Installation in Sicklerville, NJ | Then 28 Panels and a Charger

George Arthur has been a Green Sun Energy Services client since May of 2024, when he bought a new roof. The solar array followed in October and both were finished within days of each other the following February. 3,000 square feet, stripped to the deck: The old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Hickory carrying a 50-year warranty, aluminum drip edge along 310 feet of rakes, eaves and valleys, and a ridge vent along the peak. The roof was finished

Solar Panel Installation and Roofing Installation in Piscataway, NJ | First, Then 28 Panels

Tara Anthony has been a Green Sun Energy Services client since February of 2017, when the roof and the solar array were bought on the same day. The roof was finished on 10 April 2017 and the array a week later. 3,000 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 215 feet of rakes, eaves and valleys, and a ridge vent along the peak.

Solar Panel Installation and Roofing Installation in Hamilton, NJ | 21 Panels

Jim Adams has been a Green Sun Energy Services client since September of 2025, when the roof and the solar array were bought on the same day. The roof was finished on 6 October 2025 and the array in late November. 2,900 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline system in Charcoal carrying a 50-year warranty, aluminum drip edge along 244 feet of rakes, eaves and valleys, and a ridge vent along the

Scroll to Top