Solar Panel Installation in Andover Borough, NJ | 16 Panels

Andover Borough, NJ · Client since April 2021

Kevin from Andover Borough, NJ has been a Green Sun Energy Services client since April of 2021. The array was completed on 30 June: 16 panels making 5.44 kW into a SolarEdge inverter with optimizers, and an estimated 6,175 kilowatt hours in the first year. JCP&L interconnected it in July. Andover Borough is one of the smallest municipalities in the state and among the furthest north-west we work – a long way from the shore towns that make up most of this list, and a reminder that the sun does not stop at the county line. The existing roof was sound enough to take the array as it stood.

Project Facts

Location
Andover Borough, NJ
Service
Solar Panel Installation
Client since
April 2021
Panels
Hanwha Model # Q.PEAK DUO BLK-G6 340
Panels
16
System size
5.44 kW
Inverter
SolarEdge SE5000H-US000NNC2
Mounting system
Ecolibrium Solar
Estimated first-year production
6,175 kWh
Share of the home's electricity
100%
Electric utility
JCP&L

Solar questions from Andover Borough homeowners

How much does shade from mature Andover Borough trees affect production?

Shade can materially reduce production, particularly when it falls during the highest-production hours. Module-level electronics such as microinverters and optimizers reduce the effect of partial shading, but they cannot create sunlight where there is none. Significant shade should be modelled before any annual production figure is quoted.

Are all mounting systems much the same?

No. They differ substantially in attachment method, waterproofing, rail design, materials, wind rating and installation requirements. Residential systems should use appropriately listed components installed to the manufacturer's instructions, and the residential code requires rooftop mounting and structural systems to satisfy the applicable structural and listing requirements.

Do unused credits carry from month to month?

Yes. Eligible excess kWh credits generally carry through the customer's annualised net-metering period, which is what allows strong spring and summer production to offset consumption in the darker months.