Nicholas from Holmdel, NJ has been a Green Sun Energy Services client since April of 2022. The generator was commissioned in June: 17 kW on natural gas, on a 200-amp managed whole-house switch with a smart management module and surge protection, sized against a 15 kW calculation for the 2,700 square foot house. A double electric oven and a mini-split are the two loads doing most of the work in that figure – the oven draws hard at predictable times, and the mini-split draws several times its running load in the instant the compressor starts. The management module exists so the two never start together. Annual maintenance, an extended parts-and-labor warranty and monitoring we manage all sit behind the machine.
Why Nicholas chose Green Sun Energy Services
Complete backup power, from sizing and installation to the service that keeps it ready.
What makes Green Sun Energy Services different
- Standby generators: installed and serviced as a Generac Authorized Sales and Service Dealer, by factory-authorized Generac technicians. On this home: a Generac 7226 standby generator (18 kW LP / 17 kW NG) running on natural gas, on a 200-amp transfer switch (managed whole house) and serviced by Green Sun Energy Services.
- Warranty: backed by a 5-year generator workmanship warranty.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 441 completed standby generator projects across Monmouth County and 618 standby generator projects throughout New Jersey.
Our work in Holmdel
Green Sun Energy Services has completed 26 standby generator installations and 42 generator service customers in Holmdel. Holmdel, a township in Monmouth County, is served by JCP&L.
Thinking about a standby generator for your Holmdel home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Holmdel, NJ
- Services
- Standby Generator Installation, Standby Generator Service
- Client since
- April 2022
- Manufacturer & model
- Generac 7226
- Rated output
- 18 kW LP / 17 kW NG
- Fuel
- Natural Gas
- Home sized for
- 2,700 sq ft
- Electrical service
- 200 amp
- Transfer switch
- 200 amp
- Load management
- Managed Whole House
- Workmanship warranty
- 5 years
Standby generator questions from Holmdel homeowners
How quickly does it take over?
The automatic start sequence normally begins within seconds of the controller deciding that utility power has failed or fallen outside acceptable limits. There is a deliberate short delay so that a momentary flicker does not trigger a full start and transfer. Exact timing depends on the controller, the transfer switch and the configuration.
Why do outages last longer on some Holmdel streets than others?
Mature tree cover over overhead lines is the usual reason. Limbs coming down in wind, snow or ice take the lines with them, so heavily treed streets tend to see both more frequent outages and longer restoration times than open ones. It is one of the honest arguments for standby power rather than a portable generator.
Does new gas piping have to be pressure tested in Holmdel?
Yes. Gas piping subject to the adopted fuel-gas code must be inspected and tested before it is accepted. New Jersey adopts the 2024 International Fuel Gas Code, which governs the inspection, the test pressure and how long the test has to hold.