22 kW Standby Generator Installation in Red Bank, NJ | Whole-House Backup

Red Bank, NJ · Client since August 2021

Jaymie from Red Bank, NJ has been a Green Sun Energy Services client since August of 2021. The generator was commissioned in April of 2022: a Generac Guardian rated 19.5 kW on natural gas, on a 200-amp service-entrance switch with a smart management module. The load calculation asked for 17 kW across the 2,500 square foot house – a sump pump, an electric oven, two refrigerators, a washer, a gas dryer and a dishwasher – so the machine carries a comfortable margin over the requirement. Eight months separated the contract from the commissioning, the permit and utility work of that period rather than anything on site. Annual maintenance, an extended parts-and-labor warranty and monitoring we manage all sit behind it.

Project Facts

Location
Red Bank, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
August 2021
Manufacturer
Generac Model # 7043-2
Rated output
22 kW LP / 19.5 kW NG
Fuel
Natural Gas
Home sized for
2,500 sq ft
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House

After researching multiple different companies to install our generator, we chose Green Sun Energy Services. They were very professional and explained everything step by step! Would highly recommend to anyone who is looking to install a generator. Very pleased with the whole process.

— Jaymie2022Reviewed us onBBB

Green Sun Energy Services replied

Thank you, Jaymie. Being chosen after a proper comparison is the kind of decision we would rather win, because it means the reasons were understood. The 22 kW whole-house backup at your home in Red Bank was explained step by step for that same reason. Thank you for the recommendation.

Standby generator questions from Red Bank homeowners

Do generator requirements in Red Bank differ from the next town over?

The manufacturer's equipment requirements do not change when you cross a municipal boundary into Red Bank, but local zoning can. A township may impose its own side-yard and rear-yard setbacks, mechanical-equipment rules, screening, noise requirements and floodplain provisions. That is why every property gets a municipal zoning review rather than a general answer.

Why can't a generator be wired straight into the panel?

Because a standby generator needs approved transfer or interconnection equipment so that it cannot unintentionally energise the utility supply. The transfer switch is one of the most important electrical-safety components in the whole installation, not an accessory to it.

What is a sediment trap for?

It helps stop foreign material in the gas line from reaching the generator's fuel controls. Where the fuel-gas code and the system configuration call for one, it is fitted, and the maintenance schedule includes inspecting or cleaning it.

Scroll to Top