Dave from Highlands, NJ became a Green Sun Energy Services client in December of 2019. The generator was installed by another company and commissioned in September of 2017, and the relationship began with an extended warranty ordered and registered with Generac on the machine. Registering a warranty on somebody else’s installation is worth knowing about because it has a deadline most households do not realise exists – a machine only stays eligible for a limited period after it was commissioned, and once that window closes it cannot be reopened. Highlands sits at the mouth of the Shrewsbury River, where the storms arrive off the bay and the power goes with them.
Project Facts
- Location
- Highlands, NJ
- Service
- Standby Generator Service
- Client since
- December 2019
- Manufacturer
- Generac Model # 7035
- Rated output
- 16 kW LP / 16 kW NG
- Fuel
- Natural Gas
- Transfer switch
- 70 amp
- Load management
- Managed Whole House
Standby generator questions from Highlands homeowners
Does the residential building code apply to a generator?
It can. For applicable one- and two-family dwellings New Jersey adopts the 2024 International Residential Code, subject to state amendments. Structural and flood-related generator installations may therefore need review under the residential subcode as well as the electrical and fuel requirements.
Should gas pressure be checked while the generator is running?
Yes. Operating pressure means more than a static reading taken with the generator off. The fuel system has to hold adequate pressure while the generator runs and other appliances may also be drawing gas. That matters most when an existing residential service is being reused.
Can we plant shrubs or put a fence around the generator?
Yes, provided the planting or fence stays outside the required airflow and service clearances. Site-selection guidance treats shrubs, bushes and trees as part of the clear space around the machine, and clearance should be measured against how the planting will grow rather than how it looks the week it goes in. Local zoning may separately require screening.
