Monroe Township Condominium Association, Inc. in Monroe Township, NJ has been a Green Sun Energy Services client since October of 2025. In July of 2026 we installed a ChargePoint CP6021 station on a concrete pad, with two 18-foot Type 1 cables fed from a single 80-amp single-phase supply, so two residents can charge at the same time rather than wait on one connector. It is a networked commercial station, delivered configured and activated with a cloud plan, which is what lets an association control who may use it and account for the electricity it draws. Shared parking is the difficult case for EV charging: no assigned spaces, no private meter to bill, and no good answer for a resident running a cord across a walkway. A managed station is how a community solves that once, for everyone, rather than one owner at a time.
Why Monroe Township homeowners choose Green Sun Energy Services
Professional home EV charging made simple, from electrical design through final inspection.
What makes Green Sun Energy Services different
- EV charging: installed with certifications from Qmerit, ChargePoint, Enphase, SolarEdge and Tesla, by a licensed electrician and fully managed by our team. On this home: a ChargePoint CP6021-80A-L5 EV charger with two charging ports, each on its own 40-amp circuit.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 11 completed EV charger projects across Middlesex County and 91 EV charger projects throughout New Jersey.
Our work in Monroe Township
Monroe Township, in Middlesex County, is served by JCP&L.
Thinking about an EV charger for your Monroe Township home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Monroe Township, NJ
- Service
- EV Charger Installation
- Client since
- October 2025
- Manufacturer & model
- ChargePoint CP6021-80A-L5
- Charging port
- CCS (J1772)
- Charging ports
- 2
- Circuit breaker
- 40 amp per port
- Charging stations
- 1
- Estimated range added per hour
- 25 mi / 40 km
EV charger questions from Monroe Township homeowners
What size breaker do I need for a 48-amp EV charger?
A 48-amp continuous charging load typically requires a 60-amp branch circuit, subject to the charger's listing, conductor type, installation conditions, and code requirements. The electrician must size the entire circuit, not just the breaker.
Can I charge an EV parked at the curb in Monroe Township, NJ?
That depends on municipal rules, property boundaries, sidewalk safety, and whether the parking space is public or private. Running a cord across a public sidewalk is generally problematic and should not be assumed acceptable.
Does a home EV charger need an electrical permit in Monroe Township?
A new permanently installed EV charging circuit generally requires an electrical permit and inspection under New Jersey's Uniform Construction Code. Where a utility rebate is involved, the programme may also want evidence that the permit was closed out properly.
