EV Charger Installation

The charger is usually the easy part. What takes the thinking is the panel it connects to, the run from there to wherever the car actually sits, and whether the service coming into the house can carry it. These are chargers we installed at New Jersey homes, and each one names the unit, the circuit it runs on and the electrical service behind it.

91 completed EV charger projects across 74 New Jersey towns, including 8 with a review written by the customer.

ChargePoint EV charger in East Brunswick, NJ

Solar, Roofing and EV Charger Installation in East Brunswick, NJ | 21 Panels and a Charger, 121 Amps on a 100-Amp Service

Michael from East Brunswick, NJ has been a Green Sun Energy Services client since May of 2022, and came back for a car charger three years later. The roof and the array were really one project carried out in two visits twelve days apart. The charger, in 2025, is the one with something to teach. 2,900 square feet of new roof: Finished on 25 July 2022: a single layer stripped to the sheathing and carted away rather than covered over, then 2,900 square feet of composition shingle in charcoal, warranted fifty years, with screened aluminum soffit vents at the intake.

ChargePoint EV charger in Middletown, NJ

Solar, Generator and EV Charger in Middletown, NJ | Our Owner Is Client Number One

Glen from Middletown, NJ has been a Green Sun Energy Services client since April of 2011, which makes him the first name in this portfolio. He owns the company, and his own roof was the first we ever worked on. 28 panels and 6.58 kW, from 2011: Live on 6 July 2011: 28 Canadian Solar 235-watt modules on Enphase dual microinverters, rail-free mounting, estimated at 6,340 kilowatt hours in the first year. It is worth saying what those numbers meant at the time. A 235-watt panel produces roughly half what a current module of the same size does, and the

Customer EV charger in Tinton Falls, NJ

Generator, Solar, EV Charger and Holiday Lighting in Tinton Falls, NJ | Four Trades, Client Since 2020

Elizabeth from Tinton Falls, NJ has been a Green Sun Energy Services client since August of 2020. Four trades in five years, and they arrived in the reverse of the usual order – the generator first and the array last, with a car charger in between. A 16 kW Generac on a 200-amp managed switch: The load calculation asked for a minimum of 15 kW under NEC Article 220 Part IV and a 16 kW natural-gas Generac went in, running by January. It sits behind a 200-amp managed whole-house transfer switch with two load-management modules and whole-house surge protection. Those

EV Charger Installation and Solar Panel Installation in Hillsborough, NJ

Solar and EV Charger in Hillsborough, NJ | 8.1 kW Array in 2018, ChargePoint in 2023

Prabhu from Hillsborough, NJ has been a Green Sun Energy Services client since January of 2018. He and Aishwarya signed in the middle of that January and the array was producing by the end of April; the charger followed more than five years later. 27 panels and 8.1 kW: Producing by 26 April 2018: 27 Trina 300-watt modules on a SolarEdge inverter, 8.1 kW rated and estimated at 9,062 kilowatt hours in the first year. The inverter is deliberately oversized against the array rather than matched to it, which costs a little at the start and leaves the system somewhere

ChargePoint EV charger in Lawrence Township, NJ

Solar, Generator and EV Charger in Lawrence Township, NJ | Three Projects, One Winter

Deborah from Lawrence Township, NJ has been a Green Sun Energy Services client since October of 2024. She and Charles bought all three trades on the same day, and all three were in by early January – the generator, then the charger the following morning, then the array. A 22 kW Generac on a managed whole-house switch: Commissioned on 18 December 2024. The calculation asked for a minimum of 17 kW under NEC Article 220 Part IV and a Generac rated 19.5 kW on natural gas went in – 22 kW on propane – behind a 200-amp managed whole-house transfer

30-panel 7.5 kW solar array in Martinsville, NJ

Solar and EV Charger in Martinsville, NJ | 7.5 kW Array in 2014, ChargePoint in 2023

Richard from Martinsville, NJ has been a Green Sun Energy Services client since December of 2013. He and Jenn signed that December, the array was producing by the end of March, and the charger followed nearly ten years later. 30 panels and 7.5 kW, from 2014: Producing by 27 March 2014: 30 Trina 250-watt modules on Enphase M215 microinverters, rail-free mounting, 7.5 kW rated and estimated at 8,431 kilowatt hours in the first year. Two hundred and fifty watts is what a full-size panel produced in 2014, and a current module of the same footprint delivers close to twice that.

46-panel 14.26 kW solar array in Holmdel, NJ

Solar, Generator and EV Charger in Holmdel, NJ | 14.26 kW Array, Client Since 2018

David from Holmdel, NJ has been a Green Sun Energy Services client since March of 2018. Three trades since, and every one of them hangs off a 150-amp service – which is the thread running through this whole page. 46 panels and 14.26 kW: Producing by 24 May 2018: 46 all-black Hanwha Q.PEAK DUO 310-watt modules on a SolarEdge inverter, 14.26 kW rated and estimated at 15,153 kilowatt hours in the first year, with eighty feet of critter guard closing the sheltered gap beneath the panels. The inverter is deliberately oversized against the array rather than trimmed to it. The

EV Charger Installation in Warren, NJ

EV Charger in Warren, NJ | ChargePoint CPH50 Level 2 Installation

A ChargePoint CPH50 Level 2 EV charger: In January of 2024, Green Sun Energy Services installed a ChargePoint CPH50 hardwired Level 2 electric vehicle charging station at a residential property in Warren, NJ. The home is served by a 200-amp electrical service, and the charger was connected through a dedicated 60-amp breaker. The ChargePoint CPH50 is a hardwired unit with flexible amperage settings from 16 to 50 amps and a 23-foot cord with a built-in cable rack. The connector type is CCS/J1772, and the unit delivers an estimated 36 miles of range per hour of charging. The installation was completed

20 kW Generac standby generator in Rumson, NJ

Standby Generator Installation and EV Charger Installation in Rumson, NJ | 20 kW Generac

Anna from Rumson, NJ has been a Green Sun Energy Services client since August of 2020, and came back for a car charger four years later. The generator is the one people remember, and not for its size. A 20 kW Generac, and a window that had to stop opening: Commissioned on 25 February 2021. The calculation asked for a minimum of 14 kW under NEC Article 220 Part IV and a Generac rated 18 kW on natural gas went in – 20 kW on propane – behind a 200-amp managed whole-house transfer switch with a smart management module. The

Customer EV charger in Atlantic Highlands, NJ

Standby Generator, Solar and EV Charger Installation in Atlantic Highlands, NJ | A Charger

William and Corinne from Atlantic Highlands, NJ have been Green Sun Energy Services clients since February of 2022, and took on all three projects inside seven months. A 19.5 kW Generac on a managed whole-house switch: Commissioned on 26 May 2022. The calculation asked for a minimum of 15 kW under NEC Article 220 Part IV and a Generac rated 19.5 kW on natural gas went in – 22 kW were it running on propane – behind a 200-amp managed whole-house transfer switch with two smart management modules and whole-house surge protection. The house is 3,096 square feet with two

EV Charger Installation in Summit, New Jersey

EV Charger Installation in Summit, NJ | Two Hardwired ChargePoint Level 2 Stations

Dayananth from Summit, NJ has been a Green Sun Energy Services client since June of 2026. In July we installed two ChargePoint Level 2 stations, hardwired within ten feet of the breaker box, each carrying a 23-foot cord and a J1772 connector and each adjustable between 16 and 50 amps. Two chargers is the point where a house starts to meet its limits: the calculated demand here came to just under 172 amps against a 200-amp service, and both stations pulling their full 50 amps at the same time would have pushed past what the service can carry. Load management

ChargePoint EV charger in Red Bank, NJ

Solar, Generator, EV Charger and Holiday Lighting in Red Bank, NJ | Four Trades

Susan and Christopher from Red Bank, NJ have been Green Sun Energy Services clients since October of 2018. Christopher is a partner in the business, which is worth saying plainly rather than leaving a reader to find out – and it is also why this house has had four trades through it over six years, each one going onto the same 200-amp service as the last. 37 panels and 9.62 kW: The array went up first and was producing by 4 February 2019: 37 Canadian Solar modules split across two roof planes, 5.72 kW on one and 3.90 kW on