David from Holmdel, NJ has been a Green Sun Energy Services client since March of 2018. Three trades since, and every one of them hangs off a 150-amp service – which is the thread running through this whole page.
46 panels and 14.26 kW
Producing by 24 May 2018: 46 all-black Hanwha Q.PEAK DUO 310-watt modules on a SolarEdge inverter, 14.26 kW rated and estimated at 15,153 kilowatt hours in the first year, with eighty feet of critter guard closing the sheltered gap beneath the panels. The inverter is deliberately oversized against the array rather than trimmed to it. The roof needed nothing at all, which is about as easy as a solar install gets.
A 9 kW Generac on sixteen circuits
A Generac in an aluminum enclosure on its own pad, rated 8 kW on natural gas and 9 on propane, feeding a sixteen-circuit essential-circuits transfer switch in a NEMA-3R outdoor enclosure. Deliberately not a whole-house machine. What actually has to keep running at this address is a short list – two sump pumps and a refrigerator – and on a 150-amp service that restraint is not merely sensible, it is close to necessary.
A ChargePoint on a 60-amp circuit, and 144 of 150 amps
October of 2023. A ChargePoint Home Flex on a NEMA 6-50 outlet, on a dedicated 60-amp circuit at 11.5 kW – roughly 36 miles of range an hour. And here is the number that makes this house worth reading about: with the charger included, the calculated minimum service came to 144.66 amps against a 150-amp panel. Under five amps of margin. There is no version of that arithmetic anybody does by eye, and no room left for a fourth large load without upgrading the service first.
Everything on 150 amps
Fourteen kilowatts of solar, a standby generator and a fast car charger, all on a service that most houses of this size would have upgraded years ago. It works because each addition was measured against the same panel rather than assumed onto it. The array reduces what the service has to deliver on an ordinary day. The generator covers only what cannot be allowed to stop, which is why it is nine kilowatts and sixteen circuits rather than something four times the size. The charger fits inside what remains, with less than five amps to spare. That last figure is the useful one on this page: it is the difference between a house that has been designed and a house that has merely been added to, and it is only knowable because somebody did the calculation every single time.
Project Facts
- Location
- Holmdel, NJ
- Services
- EV Charger Installation, Solar Critter Guard, Solar Panel Installation, Standby Generator Installation
- Client since
- March 2018
Solar
- Panels
- Hanwha Model # Q.PEAK DUO BLK-G5.1 310
- Panels
- 46
- System size
- 14.26 kW
- Inverter
- SolarEdge SE11400A-US000NNR2
- Mounting system
- Ecolibrium Solar
- Estimated first-year production
- 15,153 kWh
- Share of the home's electricity
- 86%
- Electric utility
- JCP&L
- Critter guard fitted
- 80 ft
Standby generator
- Manufacturer
- Generac Model # 7030
- Rated output
- 9 kW LP / 8 kW NG
- Fuel
- Natural Gas
- Home sized for
- 500 sq ft
- Electrical service
- 150 amp
- Transfer switch
- 100 amp
- Load management
- Essential Circuits/NEMA-3R
EV charger
- Charger
- ChargePoint Model # CPH50-NEMA6-50-L23
- Charging port
- CCS (J1772)
- Circuit breaker
- 60 amp
- Charging stations
- 1
- Estimated range added per hour
- Estimated Range Per Hour: 36 mi / 58 km
Taking the leap into Solar can be intimidating and confusing. We reached out to Glen and a couple of other groups because we wanted to see if this made sense before the federal tax credit expires next year. Glen simplified everything for us. He has been doing this for a while and he has answers for all the common questions. Glen was very patient with us as we peppered him with questions (sometimes asking the same questions over again). After comparing quotes, Glen's numbers were reasonable and we decided to go with him because of the favorable reviews and the thoroughness with which he explained the process to us. From start to end the communication was excellent, we always knew where we were in the process (a lot of paperwork but they do it all for you). When it came time to do the installation, the crew came and finished everything in less than a day. They cleaned up after themselves and when they left the only remnants of their work were the panels on the roof. It was obvious this was not their first rodeo. Now on this sunny 90+ degree day with two air conditioners humming, I look at the meter outside and see my house if being fully powere by the sun... it is a great feeling! If you are considering solar, I highly recommend Green Sun. They are a class act and the engagement feels more like a partnership than a contractor relationship. Oh yeah, they also installed a gas generator for us and that process was equally professional and pleasurable.
Green Sun Energy Services replied
Thank you, David. Intimidating and confusing is a honest description of how solar looks from outside, and simplifying it is the first job rather than a sales technique. The 14.26 kW array at your home in Holmdel now sits alongside a standby generator and an EV charger. Glad the whole picture made sense in the end.
Questions from Holmdel homeowners
SolarWhat should a Holmdel homeowner look for in a solar company?
One that can design, permit, interconnect, install, commission, monitor and service the system, and explain the structure accurately. That means twelve months of real usage, a realistic production model, correct kW and kWh arithmetic, orientation and shading, structural capacity, the rooftop code requirements, the electrical articles for photovoltaic systems and grid interconnection, rapid shutdown, manufacturer installation instructions, utility interconnection and net metering, incentive registration, roof age and condition, penetration and waterproofing detail, the panel, inverter, mounting and workmanship warranties, monitoring, and service after the installation. The question worth asking is not who quoted least, but which company has designed the best long-term system for the house and will still be able to support it years from now.
Standby generatorDoes a 200-amp service need a 200-amp transfer switch?
A transfer switch installed in the service path has to be rated appropriately for the service and the configuration. A 200-amp service commonly uses a 200-amp service-rated switch, but the actual design is confirmed by the electrician rather than assumed from the service size.
EV chargingIs a lower charging rate enough for most households?
Frequently. A 32-amp setting is estimated at around twenty-five miles of range an hour, so an overnight window covers far more driving than most households do in a day. The charging rate worth installing is the one that refills a normal day comfortably, not the largest one the equipment can be set to.
Standby generatorHow close to the house can a generator sit in Holmdel?
For the air-cooled models covered by the manufacturer's listed installation guidance, the rear of the generator can be as close as eighteen inches to a qualifying structure when every condition of that listing is met. That eighteen inches is a tested installation dimension, not a zoning setback, and a municipality can require more.