EV Charger Installation

The charger is usually the easy part. What takes the thinking is the panel it connects to, the run from there to wherever the car actually sits, and whether the service coming into the house can carry it. These are chargers we installed at New Jersey homes, and each one names the unit, the circuit it runs on and the electrical service behind it.

91 completed EV charger projects across 74 New Jersey towns, including 8 with a review written by the customer.

EV Charger Installation in Middletown, NJ | A ChargePoint Level 2 Charger

Christelle from Middletown, NJ has been a Green Sun Energy Services client since September of 2024. The charger went in that October: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors and fed by a dedicated 60-amp circuit run from the main panel. Before any of that, the service was measured to see what it could actually carry, and it came back with room for the charger without crowding everything else in the house. That check is the difference between a charger that works every night and a panel that trips whenever the car and the dryer run

EV Charger Installation in Pennington, NJ | Tesla Wall Connector Installed

Seyhan from Pennington, NJ has been a Green Sun Energy Services client since September of 2024. In November of that year we installed a Tesla Wall Connector outdoors at the house – the third generation hardwired unit, 48 amps and 11.5 kW, on a dedicated 60-amp circuit run up from the panel in the basement. The figure that decides a job like this is the one nobody ever sees: the service was carrying enough spare capacity to take a 60-amp charger circuit without being pushed past its limit. A charger pulling that much for hours at a stretch is the

Solar Panel Installation and EV Charger Installation in Barnegat, NJ | EV Charging at Bayside Dentistry since 2023

Bayside Dentistry in Barnegat, NJ has been a Green Sun Energy Services client since January of 2023. Both jobs on this page are commercial rather than domestic in every respect – the scale, the equipment, and the reason for doing them at all. 100 panels and 36.5 kW: Finished on 31 March 2023: 100 REC N-Peak 2 all-black modules across three separate arrays of 16.06, 15.33 and 5.11 kW, feeding a SolarEdge 50 kW commercial inverter with an optimizer on every panel. Rail-free mounting, a 600-amp service, and an estimated 41,580 kilowatt hours in the first year. The roof was

EV Charger Installation in Farmingdale, NJ | Level 2 EV Charger on a 60-Amp Circuit

Jason from Farmingdale, NJ has been a Green Sun Energy Services client since April of 2026. In June we installed a ChargePoint Level 2 station in the garage, hardwired within ten feet of the breaker box on its own 60-amp circuit, with a 23-foot cord, a built-in cable rack and a J1772 connector. Hardwiring rather than using a plug is what allows the station to run at up to 50 amps, and the 60-amp circuit is sized to carry that continuously, which is the difference between adding a few miles an hour overnight and filling most of a battery. The

EV Charger Installation in Monroe Township, NJ | Charging for a Condominium Association

Monroe Township Condominium Association, Inc. in Monroe Township, NJ has been a Green Sun Energy Services client since October of 2025. In July of 2026 we installed a ChargePoint CP6021 station on a concrete pad, with two 18-foot Type 1 cables fed from a single 80-amp single-phase supply, so two residents can charge at the same time rather than wait on one connector. It is a networked commercial station, delivered configured and activated with a cloud plan, which is what lets an association control who may use it and account for the electricity it draws. Shared parking is the difficult

Solar and EV Charger in Towaco, NJ | 12.41 kW Array, Charger Seven Years Later

Anthony from Towaco, NJ has been a Green Sun Energy Services client since August of 2018. He and Teresa started with solar and came back for a car charger seven years later. 34 panels and 12.41 kW: Producing by 1 November 2018: 34 LG 365-watt modules on a SolarEdge inverter, 12.41 kW rated and estimated at 15,865 kilowatt hours in the first year. The inverter is deliberately oversized against the array rather than matched to it, which costs a little at the outset and leaves the system somewhere to grow. A ChargePoint on the garage wall: 6 June 2025. Hardwired,

EV Charger Installation in Westfield, NJ | ChargePoint on a 50-Amp Circuit

Vaidyanathan from Westfield, NJ has been a Green Sun Energy Services client since August of 2023. He signed at the end of August and the charger was working by the middle of October, a ChargePoint J1772 unit on a 50-amp circuit using the existing 14-50R outlet. Working with an outlet that is already there keeps the job to a morning rather than a rewire. Westfield is in Union County.