Towaco, NJ · Client since August 2018

Anthony from Towaco, NJ has been a Green Sun Energy Services client since August of 2018. He and Teresa started with solar and came back for a car charger seven years later.

34 panels and 12.41 kW

Producing by 1 November 2018: 34 LG 365-watt modules on a SolarEdge inverter, 12.41 kW rated and estimated at 15,865 kilowatt hours in the first year. The inverter is deliberately oversized against the array rather than matched to it, which costs a little at the outset and leaves the system somewhere to grow.

A ChargePoint on the garage wall

6 June 2025. Hardwired, J1772, on a dedicated 60-amp circuit at 11.5 kW – roughly 36 miles of range an hour – with a load-management module. The supply was run outside along the foundation and back in to the garage rather than chased through the finished interior, and the unit went on the street-facing wall. Both of those are decisions made on site with a tape measure, and between them they are most of the reason one charger installation costs more than another that looks identical on paper.

174 amps of 200

With the charger counted in, the calculated minimum service for this house came to 174.48 amps against a 200-amp panel. Twenty-five amps of headroom on a 3,850 square foot house – it fits, and it fits because the charger carries a load-management module. When the rest of the house wants the capacity, the charger gives it up. Without that module, the same house with the same charger on the same panel would have been a service-upgrade conversation instead of an afternoon’s work. That is worth knowing before buying a charger rather than after: the question is never simply whether a 60-amp circuit can be run, it is what the whole house adds up to once that circuit is in use.

Project Facts

Location
Towaco, NJ
Services
EV Charger Installation, Solar Panel Installation
Client since
August 2018

Solar

Panels
LG Model # 365Q1C-A5/40mm
Panels
34
System size
12.41 kW
Inverter
SolarEdge SE10000H-US000NNC2
Mounting system
Ecolibrium Solar
Estimated first-year production
15,865 kWh
Share of the home's electricity
100%
Electric utility
JCP&L

EV charger

Charger
ChargePoint Model # CPH50-HARDWIRE-L23
Charging port
CCS (J1772)
Circuit breaker
60 amp
Charging stations
1
Estimated range added per hour
Estimated Range Per Hour: 36 mi / 58 km

Questions from Towaco homeowners

EV chargingWhat electrical code applies to an EV charger installed in Towaco?

New Jersey adopts the National Electrical Code through the Uniform Construction Code, and the edition in force statewide is what the municipal inspector enforces. EV charging is governed principally by Article 625, which covers the branch circuit, overcurrent protection, continuous loads, load management, the disconnecting means, ground-fault protection and cord management.

SolarDoes a bigger array always produce more?

Generally yes when everything else is equal, but size alone does not decide annual production. A smaller unshaded south-facing array can outproduce a larger one that is shaded or poorly oriented. Azimuth, tilt, shading, inverter efficiency and module characteristics all bear on it.

SolarWhat is Permission to Operate?

It is the utility's authorisation for the finished system to run in parallel with the grid. Completing the installation does not by itself mean the system can be switched on: the utility generally requires the interconnection documentation, the inspections, the metering and the final approvals to be in place first.

Scroll to Top