EV Charger Installation, Solar Panel Installation and Standby Generator Installation in Middletown, NJ by Green Sun Energy Services.
Glen from Middletown, NJ has been a Green Sun Energy Services client since April of 2011, which makes him the first name in this portfolio. He owns the company, and his own roof was the first we ever worked on.
28 panels and 6.58 kW, from 2011
Live on 6 July 2011: 28 Canadian Solar 235-watt modules on Enphase dual microinverters, rail-free mounting, estimated at 6,340 kilowatt hours in the first year. It is worth saying what those numbers meant at the time. A 235-watt panel produces roughly half what a current module of the same size does, and the microinverters were early-generation – one unit serving two panels rather than one apiece. The array is still up and still producing, which is the only test of a solar installation that really counts: not what it made in year one, but whether anybody has had to think about it since.
A Generac on a managed whole-house switch
November of 2020. The calculation asked for a minimum of 18 kW under NEC Article 220 Part IV, which is a high number for 2,576 square feet, and the load survey explains it: a double electric oven, an electric dryer, two refrigerators, a separate freezer, a dishwasher and a sump pump. Electric cooking and electric drying under one roof is the combination that drives generator sizing hardest, because either one alone can rival everything else in the house put together. A Generac rated 19.5 kW on natural gas went in – 22 kW on propane – behind a 200-amp managed whole-house transfer switch with two smart management modules and whole-house surge protection.
A ChargePoint on a 60-amp circuit
October of 2023, by which point the numbers had grown tight. With a car charger included, the calculated minimum service came to 169.98 amps against a 200-amp panel – inside the rating, but not by the margin most people imagine they have. The charger went in hardwired on a 60-amp breaker at 11.5 kW, roughly 36 miles of range an hour, with a 100-amp management module.
Holiday lighting for the roof and columns
In the fall of 2025, commercial-grade C9 diamond-faceted LED bulbs went up across the roofline — 232 of them, red and white, on 12-inch spacing. The lights are shatterproof and removed after the New Year, so nothing is left on the house through the winter months when ice and wind do their work.
The columns got a lighted deluxe Colorado Pine garland in place of a plain wrap, and a 36-inch wreath was included in the installation. All of it was supplied by Green Sun, hung by Green Sun, and will come down the same way.
A soft wash for the house, decks and fence
In April of 2025, Green Sun soft washed the house along with the front walkway, the back deck and stairs, the patio beneath the deck, the pool deck, and the wood fence around the pool — 6,784 square feet of surface in total. The cleaning agent was a sodium hypochlorite and surfactant based formula, which is the standard for low-pressure biological cleaning: it kills the algae, mold and mildew at the root rather than blasting them off and leaving the spores behind.
Soft washing matters to a roof and siding because algae and mold hold moisture against surfaces that are designed to shed it. Left in place, that biological growth shortens the life of shingles and degrades painted or composite siding over time. Clearing it from the full exterior — not just the roof, but the walkways, decks and fence as well — removes the source rather than managing the symptom.
Five trades, one address
Solar went up in 2011. A generator followed in 2020. A car charger came in 2023. Holiday lighting was installed in 2025. A soft wash covered the house, decks and fence the same year. Every one of those jobs was done at the same address, served by the same 200-amp panel, and every electrical addition was sized against what was already there before a wire was touched.
That is the shape of a house that has grown with its trades rather than in spite of them. Nothing here has needed a service upgrade — but that was a conclusion reached carefully each time, not a given. The soft wash sits outside the electrical story entirely, but it belongs to the same principle: work done with attention to the whole house, not just the job on the invoice.
Project Facts
- Location
- Middletown, NJ
- Services
- Christmas Light Installation, EV Charger Installation, Softwash Service, Solar Panel Installation, Standby Generator Installation, Standby Generator Service
- Client since
- April 2011
Solar
- Panels
- Canadian Solar Model # CS6P-235PX
- Panels
- 28
- System size
- 6.58 kW
- Inverter
- EnPhase D380 Micro-Duel
- Mounting system
- Zep Solar
- Estimated first-year production
- 6,340 kWh
- Electric utility
- JCP&L
Standby generator
- Manufacturer
- Generac Model # 7043-2
- Rated output
- 22 kW LP / 19.5 kW NG
- Fuel
- Natural Gas
- Home sized for
- 2,576 sq ft
- Electrical service
- 200 amp
- Transfer switch
- 200 amp
- Load management
- Managed Whole House
EV charger
- Charger
- ChargePoint Model # CPH50-HARDWIRE-L23
- Charging port
- CCS (J1772)
- Circuit breaker
- 60 amp
- Charging stations
- 1
- Estimated range added per hour
- Estimated Range Per Hour: 36 mi / 58 km
Exterior cleaning
- Surface cleaned
- 6,784 sq ft
Holiday lighting
- Lights
- LED C9, red, 12-inch spacing
- Bulbs installed
- 232
- Also installed
- Lighted Deluxe Colorado Pine Garland - each 9' section consists of 312 tapered branches, a 14" diameter, with 100 red &…
- Included
- 36" Wreath
Questions from Middletown homeowners
Standby generatorDoes the residential building code apply to a generator?
It can. For applicable one- and two-family dwellings New Jersey adopts the 2024 International Residential Code, subject to state amendments. Structural and flood-related generator installations may therefore need review under the residential subcode as well as the electrical and fuel requirements.
SolarWhat does NEC Article 705 cover?
It governs electrical systems where power-production equipment such as solar runs in parallel with another source, normally the utility grid. It is what decides how the array is allowed to connect to the home's service or distribution equipment.
EV chargingCan a ChargePoint Home Flex be set lower if the panel is full?
Yes -- that is the point of the adjustable output. A house that cannot carry 48-amp charging might run at 32 amps on a 40-amp circuit, or 24 amps on a 30-amp one, where the load calculation and the installation support it.
Soft washingCan pressure washing make windows leak?
High-pressure water can expose weaknesses in seals, caulk or flashing and can force water into areas normal rainfall may not reach. A professional exterior wash should not direct concentrated high pressure at window edges.
Holiday lightingCan arborvitae be wrapped with Christmas lights?
Yes. Arborvitae are particularly well suited to mini light wrapping because of their tall, dense shape. The amount of lighting required depends heavily on height, width, the density level chosen and the brightness you want.
EV chargingWhy does the charger sit on a 60-amp breaker?
Because 48-amp charging is a continuous load, and the code requires the overcurrent protection for a continuous load to be sized at not less than 125 percent of it. Forty-eight amps multiplied by 1.25 is sixty. The breaker is not oversized; it is sized correctly for a load that runs for hours without pause.