Christmas Light Installation

Christmas Light Installation in Manalapan, NJ

Holiday Light Installation in Manalapan, NJ | 214 Warm White C7 Bulbs Around the Windows

Tina from Manalapan, NJ has been a Green Sun Energy Services client since November of 2024. The job was 214 C7 bulbs in warm white at 3000K, run around the windows rather than along the roofline, and it was finished in December of 2024. This was the first season, so the runs were measured and cut for these openings. Windows are the harder outline to light well: a roofline is one long straight run, while windows are a series of short ones that only look right if each is squared to its own frame.

Christmas Light Installation and Standby Generator Service in Middletown, NJ

Standby Generator Service and Holiday Lighting in Middletown, NJ | A 2012 Generac and 210 C9 Bulbs

Brian from Middletown, NJ has been a Green Sun Energy Services client since March of 2020. Two very different jobs on one house, five years apart. The generator: A Generac 5887 rated 20 kW on propane and 18 kW on natural gas, running on natural gas, feeding a 90-amp transfer switch. It was installed in December of 2012 by another company. Green Sun took it on in March of 2020 and has serviced it every year since – April in 2020, 2021, 2022, 2023 and 2024, March of 2025 and February of 2026. Seven consecutive visits on a machine now

Christmas Light Installation in Holmdel, NJ

Soft Washing and Christmas Light Installation in Holmdel, NJ | 10,659 Square Feet Washed and 1,337 C9 Bulbs

Tom and Karen from Holmdel, NJ have been Green Sun Energy Services clients since May of 2025. Two jobs at opposite ends of one year: the house was washed in June and lit in November. 10,659 square feet soft washed: Soft washing is not power washing. The surfaces are treated with a sodium hypochlorite and surfactant solution that kills the organic growth – the dark streaking that spreads across a shaded roof slope, the green film that creeps up siding on the north side of a house – and then rinsed at low pressure. Nothing is blasted. On a roof

Christmas Light Installation in East Brunswick, NJ

Christmas Light Installation in East Brunswick, NJ | 114 Warm White C9 Bulbs Along the Roofline

Joe from East Brunswick, NJ has been a Green Sun Energy Services client since December of 2024. The roofline carries 114 commercial-grade C9 bulbs in warm white – a 2700K tone closer to candlelight than the blue-white of a cheaper LED – supplied, measured and installed by Green Sun in the week after the job was booked. C9 is the larger traditional bulb, shatterproof here, and at that spacing the run reads as a continuous line from the street rather than a row of dots.

Christmas Light Installation in Lincroft, NJ | 160 Bulbs, Installed in November of 2024

Millie from Lincroft, NJ has been a Green Sun Energy Services client since November of 2024. The display was booked on 14 November and installed nine days later, ahead of the season. It is a 160-bulb installation. Holiday lighting is one of the few jobs where almost all of the work is in the parts nobody sees: the ladder time, the connections, and the fact that somebody else is answerable if a run goes dark in December. The bulb count is what sets the look, being enough to read continuously from the street rather than in patches.

Standby Generator Installation and Holiday Lighting in Millstone Township, NJ | 24 kW and 161 C7 Bulbs

Edward from Millstone Township, NJ has been a Green Sun Energy Services client since April of 2021. The generator came first and the holiday lighting followed three winters later, on the same house and the same rooflines. A 24 kW standby generator: The Generac was commissioned in April of 2021 and is rated 24 kW on propane and 21 kW on the natural gas it runs on here. The load survey came to 4,000 square feet, which is what puts it at the top of the air-cooled range, and a 200-amp automatic transfer switch backs the whole panel rather than

Generator Service and Holiday Lighting in Marlboro, NJ | A 24 kW Takeover and a Lit Roofline

Mark from Marlboro, NJ has been a Green Sun Energy Services client since June of 2021, when the servicing of a generator installed by another company came to us. Four years later the household added something entirely unrelated to it. A 24 kW Generac taken on at three weeks old: The machine is a 24 kW Generac on natural gas, behind a managed whole-house transfer switch, and it was barely commissioned when its servicing moved to us in June of 2021. That is an unusual moment to take a generator on, and a revealing one: most takeovers happen at five

Standby Generator Installation and Holiday Lighting in Cream Ridge, NJ | 20 kW Generac

Adam from Cream Ridge, NJ has been a Green Sun Energy Services client since June of 2020, and came back for holiday lighting five years later. A 20 kW Generac on twin 200-amp switches: Commissioned on 25 September 2020. The calculation asked for a minimum of 17 kW under NEC Article 220 Part IV and a Generac rated 18 kW on natural gas went in – 20 kW were it running on propane – feeding two 200-amp service-rated transfer switches which between them cover a 400-amp service. Two switches rather than one is simply what 400 amps requires: there is

Standby Generator Service and Holiday Lighting in Lincroft, NJ | Servicing and Holiday Lights

Jared from Lincroft, NJ has been a Green Sun Energy Services client since April of 2024, when the servicing of a generator installed by another company came to us. A 22 kW Generac on a 150-amp service: The machine is a 22 kW Generac on natural gas, commissioned in December of 2021 by another company, behind a managed whole-house transfer switch on a 150-amp service. Its servicing moved to us just over two years later. That is early for a takeover and it is the best moment for one: nothing has been neglected yet, the machine is still well inside

Standby Generator, Soft Washing and Holiday Lighting in Leonardo, NJ | Holiday Lights and Soft Washing

Nelson from Leonardo, NJ has been a Green Sun Energy Services client since February of 2022, and has come back twice since – once for the roofline and once for the siding. A 19.5 kW Generac on a managed whole-house switch: Commissioned on 14 July 2022. The load calculation asked for a minimum of 15 kW under NEC Article 220 Part IV, and a Generac Guardian rated 19.5 kW on natural gas went in – 22 kW were it running on propane – behind a 200-amp managed whole-house transfer switch with two smart management modules and whole-house surge protection. The

Scroll to Top