Generac 16 kW Standby Generator in Holmdel, NJ | Installed in Twelve Days

Holmdel, NJ · Client since June 2018

Hui from Holmdel, NJ has been a Green Sun Energy Services client since June of 2018. He signed on the seventh of June and the generator was commissioned on the nineteenth, twelve days from signature to running, which is the fastest generator installation in our records. It is a 16 kW Generac in an aluminium enclosure on its own pad behind a 200-amp service-rated switch, covering 4,000 square feet. Holmdel is in Monmouth County.

Scroll to Top