Roofing and Solar Panel Installation in Green Brook, NJ | A New Roof, Then 8.91 kW

Green Brook, NJ · Client since December 2023

Megan and David from Green Brook, NJ have been Green Sun Energy Services clients since December of 2023. Roof and array were signed on the same day and built two weeks apart, roof first.

A new roof

GAF Timberline Lifetime shingle, finished in February of 2024, taking in 222 feet of rakes, eaves and valleys – the edges and the water channels, where the ice-and-water membrane goes.

8.91 kW of solar

Twenty-two Qcells 405-watt panels on a Snap-N-Rack mounting system, finished in March of 2024, with first-year production estimated at 8,726 kWh. The job took in 120 feet of critter guard around the perimeter.

Two weeks between them

A roof has to come off before an array can go back on it, and taking twenty-two panels down and refitting them is a job in its own right. Doing the roof first meant that never became a question here.

Project Facts

Location
Green Brook, NJ
Services
Roofing Installation, Solar Critter Guard, Solar Panel Installation
Client since
December 2023

Solar

Panels
Qcells Model # Q.PEAK DUO BLK ML G10+ 405
Panels
22
System size
8.91 kW
Inverter
SolarEdge SE7600H-USNBBL14 HD Wave Energy Hub
Mounting system
Snap-N-Rack
Estimated first-year production
8,726 kWh
Share of the home's electricity
100%
Electric utility
PSE&G
Critter guard fitted
120 ft

Roof

System
GAF Timberline Lifetime Roofing System
Area replaced
2,200 sq ft
Warranty
50 years

Questions from Green Brook homeowners

SolarIs the roof strong enough to carry solar?

It has to be verified as part of the design rather than assumed. The residential code requires the roof structure to support the loads the array imposes in addition to snow, wind and the rest. The evaluation looks at rafter or truss size, span, spacing, roof material, system weight, snow and wind loads, and where the attachments land.

SolarWhat should a Green Brook homeowner look for in a solar company?

One that can design, permit, interconnect, install, commission, monitor and service the system, and explain the structure accurately. That means twelve months of real usage, a realistic production model, correct kW and kWh arithmetic, orientation and shading, structural capacity, the rooftop code requirements, the electrical articles for photovoltaic systems and grid interconnection, rapid shutdown, manufacturer installation instructions, utility interconnection and net metering, incentive registration, roof age and condition, penetration and waterproofing detail, the panel, inverter, mounting and workmanship warranties, monitoring, and service after the installation. The question worth asking is not who quoted least, but which company has designed the best long-term system for the house and will still be able to support it years from now.

RoofingAre black streaks on my roof a sign that it is failing?

Often the streaks are algae rather than structural failure. Algae can affect appearance and may be treated with roof-safe methods, but pressure washing shingles is generally not recommended because it can damage the surface.

Scroll to Top