Standby Generator Installation and Solar Panel Installation in Belford, NJ | A Small Array, a Full-Size Generator

Belford, NJ · Client since April 2018

Jeffrey in Belford has been a Green Sun Energy Services client since April of 2018. The array went up that July and the standby generator followed four years later.

14 panels in July 2018

Fourteen Hanwha Q.PEAK DUO 320-watt panels, 4.48 kW in total, on Ecolibrium mounting with a SolarEdge SE3800H inverter and an optimizer on every panel. Estimated first-year production is 5,556 kWh and the utility is JCP&L.

This is a modest array by the standards of these pages, and the reason is the roof rather than the ambition. The house is 1,837 square feet; there is only so much usable, unshaded, correctly oriented surface on a building that size, and an array that overruns it starts adding panels that never pay their way. Fourteen was what the roof supported.

17 kW of backup in October 2022

The generator, by contrast, is not small at all. It is a Generac Guardian 18 kW, model 7226, delivering 17 kW on natural gas, behind a 200-amp service-rated transfer switch with surge protection, commissioned on 27 October 2022.

Four and a half kilowatts of solar and seventeen kilowatts of generator on the same house looks inconsistent until you notice they are answering different questions. The array is limited by roof area. The generator is sized to what the house draws when everything runs at once — a calculation that comes to 16,444 watts here, reduced to 12,444 once the 4,000 watts of air conditioning is managed. Neither number has any bearing on the other.

It was last serviced on 20 August 2026.

A refrigerator and a separate freezer

There is a refrigerator in the kitchen and a separate freezer elsewhere in this house, and between them they are the most persuasive argument on the property for having bought a generator at all.

Cold storage is the household load that fails silently and expensively. Everything else about an outage announces itself — the lights are off, the television is dead, the house cools down — and everything else is recoverable the moment the power returns. A freezer is different. It carries on looking exactly like a working freezer for a day or so, and by the time anyone opens it the decision has already been made for them.

A separate freezer usually means a household that buys in bulk or preserves what they grow or catch, which is to say the contents represent months of accumulation rather than a weekly shop. There is no version of an outage in which that is a minor loss, and no version in which the household finds out early enough to do anything about it.

The panels on the roof are no help here. A grid-tied array shuts down the moment the utility supply fails, and must, so that it cannot energise a line a crew is working on. Keeping two compressors running through a three-day storm is a job for the machine beside the house.

Project Facts

Location
Belford, NJ
Services
Solar Critter Guard, Solar Panel Installation, Standby Generator Installation, Standby Generator Service
Client since
April 2018

Solar

Panels
Hanwha Model # Q.PEAK DUO-G5.320
Panels
14
System size
4.48 kW
Inverter
SolarEdge SE3800H-US000NNC2
Mounting system
Ecolibrium Solar
Estimated first-year production
5,556 kWh
Share of the home's electricity
97%
Electric utility
JCP&L
Critter guard fitted
120 ft

Standby generator

Manufacturer
Generac Model # 7226
Rated output
18 kW LP / 17 kW NG
Fuel
Natural Gas
Home sized for
1,837 sq ft
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House

Questions from Belford homeowners

SolarWhat makes a good solar panel?

For most homeowners it is a high-quality residential module with strong efficiency, a low degradation rate, and product and performance warranties, that fits the roof geometry available. Efficiency, wattage, temperature coefficient, mechanical-load rating, hail testing and the manufacturer's financial stability are all worth comparing.

Standby generatorWhich fuel-gas code applies?

New Jersey currently adopts the 2024 International Fuel Gas Code as its Fuel Gas Subcode, which is what governs the piping, testing and shutoff arrangements on a natural-gas generator installation.

Standby generatorDoes new gas piping have to be pressure tested in Belford?

Yes. Gas piping subject to the adopted fuel-gas code must be inspected and tested before it is accepted. New Jersey adopts the 2024 International Fuel Gas Code, which governs the inspection, the test pressure and how long the test has to hold.