Don from Aberdeen, NJ has been a Green Sun Energy Services client since August of 2018. The contract was signed in mid-August and the array was producing five weeks later in September, about as quick as permitting allows. It is 42 Mission Solar 300-watt panels on a SolarEdge inverter, 12.6 kW rated and designed for about 11,863 kilowatt-hours a year. Mission Solar builds in Texas, which mattered to some buyers then and matters to more of them now. The array went up with 180 feet of critter guard around it, closing the sheltered gap beneath the panels — on a 42-panel roof that is a long perimeter, and every foot of it is somewhere a bird would happily nest. Aberdeen is in Monmouth County.
very professional. looking forward to not paying JCPL any more, was completed on time and beyond expectations.
