
Jamie Anne from Hazlet, NJ has been a Green Sun Energy Services client since October of 2020. The machine is a Generac 7171 rated 10 kW on propane and 9 kW on natural gas, running on natural gas, on a 100-amp transfer switch, and it was commissioned in May of 2021. Ten kilowatts is the small end of the residential air-cooled range and it is the right answer where the load calculation comes in under it. Green Sun has serviced it every year since – April of 2022, April of 2023, April of 2024, February of 2025 and February of 2026 – and it reports to remote monitoring in between.
Why Jamie Anne chose Green Sun Energy Services
Complete backup power, from sizing and installation to the service that keeps it ready.
What makes Green Sun Energy Services different
- Standby generators: installed and serviced as a Generac Authorized Sales and Service Dealer, by factory-authorized Generac technicians. On this home: a Generac 7171 standby generator (10 kW LP / 9 kW NG) running on natural gas, on a 100-amp transfer switch (essential circuits/nema-1r (indoor)) and serviced by Green Sun Energy Services.
- Warranty: backed by a 5-year generator workmanship warranty.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 441 completed standby generator projects across Monmouth County and 618 standby generator projects throughout New Jersey.
Our work in Hazlet
Green Sun Energy Services has completed 13 standby generator installations and 21 generator service customers in Hazlet. Hazlet, a township in Monmouth County, is served by JCP&L.
Thinking about a standby generator for your Hazlet home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Hazlet, NJ
- Services
- Standby Generator Installation, Standby Generator Service
- Client since
- October 2020
- Manufacturer & model
- Generac 7171
- Rated output
- 10 kW LP / 9 kW NG
- Fuel
- Natural Gas
- Home sized for
- 1,343 sq ft
- Electrical service
- 200 amp
- Transfer switch
- 100 amp
- Load management
- Essential Circuits/NEMA-1R (Indoor)
- Workmanship warranty
- 5 years
Standby generator questions from Hazlet homeowners
How much space is needed at the ends of the generator?
Applicable air-cooled installation instructions commonly require about three feet at the ends. That space protects cooling airflow, exhaust operation and the access a technician needs to work on the machine. The model-specific manual controls.
Does a generator keep the well running during an outage in Hazlet?
Yes, when the well pump is included in the design. A private well pump is electric, so without power there is no running water at all -- a different order of problem from losing the lights. Homes on a well are among the clearest cases for standby power, and the pump belongs on the load list from the start.
How level does a generator have to be?
Within the leveling tolerance specified in its installation manual -- applicable air-cooled instructions have used roughly a half-inch overall. A poorly prepared base can settle after installation and bring on drainage, vibration or enclosure problems that were not there on the day it went in.
