Elizabeth from Branchburg, NJ has been a Green Sun Energy Services client since July of 2024. The 22 kW Generac at the house dates from 2018 and runs on natural gas behind a 100-amp automatic transfer switch. Green Sun has serviced it every year since the plan began – August of 2024, July of 2025 and August of 2026 – each visit covering the spark plug and air filter, oil and filter, battery inspection, load testing and a full diagnostic check.
Why Elizabeth chose Green Sun Energy Services
We keep your generator ready before the power goes out.
What makes Green Sun Energy Services different
- Standby generators: installed and serviced as a Generac Authorized Sales and Service Dealer, by factory-authorized Generac technicians. On this home: a standby generator serviced by Green Sun Energy Services.
- Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 26 completed generator service projects across Somerset County and 934 generator service projects throughout New Jersey.
Our work in Branchburg
Green Sun Energy Services has completed 3 generator service customers in Branchburg. Branchburg, a township in Somerset County, is served partly by JCP&L and partly by PSE&G.
Thinking about generator service for your Branchburg home? Tell us about your project here or call 732-410-7818.
Power it. Protect it. Maintain it.
Project Facts
- Location
- Branchburg, NJ
- Service
- Standby Generator Service
- Client since
- July 2024
- Manufacturer & model
- Generac 70432
- Rated output
- 22 kW LP / 19.5 kW NG
- Fuel
- Natural Gas
- Transfer switch
- 100 amp
- Load management
- Managed Whole House
Standby generator questions from Branchburg homeowners
Will a 22 kW generator run an entire Branchburg house?
For many homes, yes, but that does not mean every load can run at the same moment. Houses with two central air conditioners, electric heat, EV charging, pool equipment or electric cooking may need load management or a larger machine. The answer comes from a load calculation rather than from the phrase whole house.
Does the generator need its own gas shutoff?
The fuel installation has to include the shutoff arrangements required by the adopted fuel-gas code and by the installation instructions. The valve must be positioned where it is accessible, both for servicing and for isolating the machine in an emergency.
Can a generator go under a deck?
Only if the specific installation satisfies every requirement for overhead clearance, airflow, exhaust, fire separation, carbon-monoxide safety and service access. Because the applicable guidance commonly requires substantial overhead clearance, many ordinary under-deck locations will not qualify. It is a site-specific review rather than a standard placement.