Standby Generator Service in Middletown, NJ | A 20 kW Generac Serviced Every Year From 2021 to 2025

Middletown, NJ · Client since November 2021

Victor from Middletown, NJ has been a Green Sun Energy Services client since November of 2021. The 20 kW Generac at the house dates from February of 2014 and runs on natural gas behind a 90-amp transfer switch, on a plan covering annual maintenance and an extended parts-and-labor warranty. It has been serviced every year from 2021 through 2025 – spark plug and air filter, oil and filter, battery inspection, load testing and diagnostics each time.

Project Facts

Location
Middletown, NJ
Service
Standby Generator Service
Client since
November 2021
Manufacturer
Generac Model # 6244
Rated output
20 kW LP / 18 kW NG
Fuel
Natural Gas
Transfer switch
90 amp
Load management
Managed Whole House

Excellent and professionally installed, respectful of homeowners property and priorities.

— Victor2021Reviewed us onAngi

Green Sun Energy Services replied

Thank you. Working around a home rather than through it is something we ask of every crew, and it is easy to say and harder to do on an installation day. Glad the work was clean and the household left as it was found. Thank you for choosing Green Sun Energy Services.

Standby generator questions from Middletown homeowners

Does new gas piping have to be pressure tested in Middletown?

Yes. Gas piping subject to the adopted fuel-gas code must be inspected and tested before it is accepted. New Jersey adopts the 2024 International Fuel Gas Code, which governs the inspection, the test pressure and how long the test has to hold.

Does the house run on the generator during its weekly exercise?

Not necessarily -- it depends on the generation of equipment, the controller and the configuration. Traditional systems commonly exercise without transferring the house at all. Newer equipment with current controls may support different exercise and transfer behaviour.

Does the generator have to be bolted down?

Not every ground-level installation uses the same anchoring method. The requirement changes with the model, the pad type, wind exposure, flood requirements, elevated platforms and any local engineering requirement. The model manual and the site conditions decide it.

Scroll to Top