Marilyn from Farmingdale, NJ has been a Green Sun Energy Services client since January of 2020. The generator was commissioned in March, on a whole-house transfer switch rather than a critical-load panel – so nothing had to be nominated in advance as the part of the house that keeps working. Seven weeks separated the contract from the commissioning, which is a quick turn for a generator: the permit, the utility gas connection and the equipment all have to line up, and any one of them can add months. Annual maintenance, a ten-year extended parts-and-labor warranty and monitoring we manage all sit behind the machine.

Project Facts

Location
Farmingdale, NJ
Services
Standby Generator Installation, Standby Generator Service
Client since
January 2020
Manufacturer
Generac Model # 7176
Rated output
16 kW LP / 16 kW NG
Fuel
Natural Gas
Home sized for
2,200 sq ft
Electrical service
150 amp
Transfer switch
150 amp
Load management
Managed Whole House

Standby generator questions from Farmingdale homeowners

Will a 22 kW generator run an entire Farmingdale house?

For many homes, yes, but that does not mean every load can run at the same moment. Houses with two central air conditioners, electric heat, EV charging, pool equipment or electric cooking may need load management or a larger machine. The answer comes from a load calculation rather than from the phrase whole house.

Will a larger gas meter be needed?

Possibly. A generator can significantly increase a home's maximum gas demand. If the existing meter or service cannot hold the required pressure while supplying the generator and the other appliances together, the gas utility may require an upgrade.

Can a standby generator backfeed the utility lines?

A properly installed and functioning automatic transfer system is designed to prevent it. That is the point of the transfer switch: it stops generator power reaching the utility supply, where it could endanger line workers and damage equipment. Backfeeding is a risk of improvised connections, not of a correctly installed system.