Solar Panel Installation in Midland Park, NJ | 19 Panels and 102 Feet of Guard

Midland Park, NJ · Client since October 2019

Rebecca from Midland Park, NJ has been a Green Sun Energy Services client since October of 2019. The array was finished on the last day of that year: 19 panels making 6.65 kW into a SolarEdge HD Wave inverter, with an optimizer on each panel and a 25-year warranty covering both, and 102 feet of critter guard around the perimeter. The design estimates 7,653 kilowatt hours in the first year, and PSEG interconnected the system in February of 2020. The existing roof was sound enough to build on, so the work stayed with the array – which is the outcome to hope for, since a roof that needs replacing first turns one project into two.

Why Rebecca chose Green Sun Energy Services

More than solar panels: a professionally managed energy system, from design and permitting through installation, inspection, activation and ongoing support.

What makes Green Sun Energy Services different

  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with SolarEdge optimizers on every panel so each one reports its own output. On this home: a 6.65 kW solar array of 19 LG 350N1C-V5 panels, a SolarEdge SE5000H-US000NNC2 HD Wave inverter, the Unirac mounting system and 102 ft of critter guard.
  • Warranty: backed by a 25-year solar workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with completed solar projects across Bergen County and 361 solar projects throughout New Jersey.

Our work in Midland Park

Midland Park, a borough in Bergen County, is served by PSE&G.

Generate electricity on your roof and use it to help power your vehicle.

Thinking about solar for your Midland Park home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Midland Park, NJ
Services
Solar Critter Guard, Solar Panel Installation
Client since
October 2019
Manufacturer & model
LG 350N1C-V5
Panels
19
System size
6.65 kW
Inverter
SolarEdge SE5000H-US000NNC2 HD Wave
Mounting system
Unirac
Estimated first-year production
7,653 kWh
Electric utility
PSE&G
Critter guard fitted
102 ft
Workmanship warranty
25 years

Solar questions from Midland Park homeowners

Why is annual offset the number that matters?

Because the value of net metering is strongest where solar production offsets electricity the household would otherwise have bought. Producing substantially more than a year's consumption means the surplus is ultimately treated differently from the credit that offsets consumption.

What is hosting capacity, and can it affect a Midland Park property?

Hosting capacity is how much distributed generation a part of the grid can take without affecting safety or reliability. A neighborhood with a lot of existing solar can face interconnection limits even where the individual property is ideal for it -- which is why the utility review is not a formality.

Can future electricity use be counted when sizing the array?

Potentially, particularly where the household expects documented new loads such as an EV, a heat pump or another electrification project. The utility's interconnection requirements decide what documentation and load assumptions are acceptable, so an installer should not simply oversize the system and hope for approval.

Scroll to Top