Solar Panel Installation and EV Charger Installation in Belmar, NJ | A Charger First, Then 21 Panels

Belmar, NJ · Client since May 2025

Richard from Belmar, NJ has been a Green Sun Energy Services client since May of 2025, and the charger went in before the array – which is the order that gives an array something solid to be sized against.

A ChargePoint by the parking pad

30 May 2025. Hardwired, J1772, on a dedicated 60-amp circuit at 11.5 kW – roughly 36 miles of range an hour – mounted outdoors beside the parking pad, with the run taken through the open basement and crawlspace rather than chased through finished walls. With the charger counted in, the calculated minimum service came to 146.55 amps against a 200-amp supply. That is a comfortable margin, though not the same thing as an idle one: 2,111 square feet with two sump pumps, two refrigerators, a dishwasher and the laundry is already using a fair share of what the service can give.

21 panels and 9.03 kW across four roof faces

10 September: 21 Jinko 430-watt modules with Enphase IQ8PLUS microinverters, rail-mounted, spread across four separate roof faces at 3.87, 2.15, 2.15 and 0.86 kW – the smallest of them two panels. Estimated at 11,073 kilowatt hours in the first year and interconnected by JCP&L in October. Four orientations on one house is the case for microinverters in a sentence: every panel converts on its own, so the two-panel face earns its keep instead of dragging down everything it would otherwise be wired in series with.

Why this order beats the other one

Installing the charger first and the array three months later is not a delay, it is a measurement. A car is the largest single change most households ever make to their electricity consumption, and until it is actually plugged in at home every night, the size of that change is an estimate. By September this house knew what it used. The array was then sized against a real number rather than a projected one – and on a roof split four ways, where each additional panel has to earn a place on a smaller and more awkward face than the one before it, knowing exactly how much you need is worth more than usual.

Why Richard chose Green Sun Energy Services

Professional home EV charging made simple, from electrical design through final inspection.

More than solar panels: a professionally managed energy system, from design and permitting through installation, inspection, activation and ongoing support.

What makes Green Sun Energy Services different

  • EV charging: installed with certifications from Qmerit, ChargePoint, Enphase, SolarEdge and Tesla, by a licensed electrician and fully managed by our team. On this home: a ChargePoint CPH50-HARDWIRE-L23 EV charger on a 60-amp circuit.
  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with Enphase microinverters on every panel so each one reports its own output. On this home: a 9.03 kW solar array of 21 Jinko JKM430N-54HL4R-B panels, an EnPhase IQ8PLUS-72-M-US Micro-Single inverter and the IronRidge mounting system.
  • Warranty: backed by a 10-year solar workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 35 completed EV charger projects and 138 completed solar projects across Monmouth County and 91 EV charger projects and 361 solar projects throughout New Jersey.

Our work in Belmar

Belmar, a borough on the Atlantic Ocean in Monmouth County, is served by JCP&L.

Thinking about solar, an EV charger, or both for your Belmar home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Belmar, NJ
Services
EV Charger Installation, Solar Panel Installation
Client since
May 2025

Solar

Manufacturer & model
Jinko JKM430N-54HL4R-B
Panels
21
System size
9.03 kW
Inverter
EnPhase IQ8PLUS-72-M-US Micro-Single
Mounting system
IronRidge
Estimated first-year production
11,073 kWh
Share of the home's electricity
100%
Electric utility
JCP&L
Workmanship warranty
10 years

EV charger

Manufacturer & model
ChargePoint CPH50-HARDWIRE-L23
Charging port
CCS (J1772)
Circuit breaker
60 amp
Charging stations
1
Estimated range added per hour
36 mi / 58 km

Questions from Belmar homeowners

EV chargingWhich charger makes sense if the next car might be a different brand?

A universal approach is worth considering: a Home Flex with either connector, or a Tesla Universal Wall Connector with its integrated J1772 adapter. A charger installed today is likely to outlast the car parked in front of it, so the connector decision is worth making for the household rather than the current vehicle.

EV chargingWhy does the charger sit on a 50-amp breaker?

Because 40-amp charging is a continuous load, and the code requires overcurrent protection for a continuous load to be at least 125 percent of it. Forty amps multiplied by 1.25 is fifty. Forty amps is also the most that charging equipment is generally permitted to draw through a plug rather than a hardwired connection.

EV chargingHow long does it take to charge an electric car at home?

That depends on the size of the battery, how depleted it is, the capacity of the vehicle's onboard charger and the output of the charging equipment. A charger capable of 48 amps does not mean every vehicle will draw 48 amps. The car has the final say in how much AC power it accepts.

SolarWhat does a 460-watt panel mean?

It is rated to produce up to about 460 watts under standardised laboratory conditions. Twenty-five of them make 11.5 kW DC; twenty-six make 11.96 kW. The panel count and the wattage should multiply out to the DC system size stated in the proposal -- if they do not, something has been rounded that should not have been.

SolarHow does residential solar work on a Belmar home?

The panels convert sunlight into direct-current electricity, and an inverter or microinverters convert that into alternating current the house can use. When the array produces more than the house is drawing, the surplus flows out through the utility meter under New Jersey's net-metering rules. When the house needs more than the array is making, the difference comes from the utility.