Wayne from Branchburg, NJ has been a Green Sun Energy Services client since October of 2019. The generator was installed by another company and commissioned in September of 2018, and the servicing came to us just over a year later – early enough that the first-year service was our first visit. Every interval since has been kept without a gap: 2020, 2021, 2022, 2023, 2024 and 2025, running from the two-year service through to the seven-year, 1,200-hour one. An unbroken run like that is the whole argument for a plan rather than a reminder – each visit is booked because the last one happened, and nothing depends on somebody remembering in the middle of a busy year. An annual maintenance plan covers the visit.

Project Facts

Location
Branchburg, NJ
Service
Standby Generator Service
Client since
October 2019

Standby generator questions from Branchburg homeowners

Why do outages last longer on some Branchburg streets than others?

Mature tree cover over overhead lines is the usual reason. Limbs coming down in wind, snow or ice take the lines with them, so heavily treed streets tend to see both more frequent outages and longer restoration times than open ones. It is one of the honest arguments for standby power rather than a portable generator.

What should a Branchburg homeowner look for in a generator installer?

A contractor who can design, permit, install, commission, maintain and repair the whole system rather than one who sells the machine. That means generator sizing and transfer equipment, disconnect and shutdown requirements, grounding and bonding, the manufacturer's own installation requirements, gas or propane capacity and pressure, the model-specific clearances, the municipal zoning setbacks, windows and vents and carbon-monoxide entry points, flood requirements where they apply, permits and inspections, utility coordination, load management, commissioning, warranty registration, monitoring and long-term service. The lowest proposal is not necessarily the lowest cost over the life of the system.

How quickly does it take over?

The automatic start sequence normally begins within seconds of the controller deciding that utility power has failed or fallen outside acceptable limits. There is a deliberate short delay so that a momentary flicker does not trigger a full start and transfer. Exact timing depends on the controller, the transfer switch and the configuration.