Solar, a Generator and Soft Washing in Asbury Park

Asbury Park, NJ · Client since September 2016

Dimitra from Asbury Park, NJ has been a Green Sun Energy Services client since September of 2016, and has come back twice since. The generator and the array were booked on the same day and finished within a week of each other. The soft wash came nine years later.

A 16 kW Generac in a steel enclosure

Commissioned on 5 November 2016. The load calculation asked for a minimum of 12 kW under NEC Article 220 Part IV and a 16 kW machine went in, on a 200-amp managed whole-house transfer switch. The house is 2,400 square feet with a refrigerator, a separate freezer, a dishwasher, a washer, a gas dryer and – the detail that matters most here – two sump pumps. A sump that stops during a storm is how a basement floods, and this close to the water the outage and the rain tend to arrive together.

27 panels across four roof faces

Six days later: 27 LG 315-watt modules, 8.51 kW, on a SolarEdge inverter with an optimizer on every panel and rail-free mounting. The array is split across four separate roof faces – 4.73, 2.21, 0.95 and 0.63 kW – which is precisely the situation optimizers exist for. Four orientations mean four different production curves through the day, and without per-panel electronics the weakest face sets the pace for the string it sits on. Estimated at 7,864 kilowatt hours in the first year and interconnected by JCP&L that December. The roof needed nothing.

1,513 square feet of soft washing

July of 2025. Soft washing is low pressure and a cleaning solution rather than a pressure washer, which is what makes it safe on siding – and what makes it the only sensible method on a house carrying an array. A pressure washer aimed anywhere near panels, flashings and conduit is a repair bill waiting to happen. This cleans the house and leaves the system alone.

Why the array and the generator were bought together

They answer opposite questions, and people often assume one covers both. A grid-tied array does not run during an outage – when the grid goes down the inverter shuts down with it, so that nobody working on the lines is fed power from a house. The panels cut the bill and do nothing whatever on the night the power fails, which in a basement with two sump pumps is the night that matters. Booking both on the same day is a household that had already worked that out, and each is still doing the job it was bought to do.

Don't waste your time looking anywhere else. You get what you pay for with Green Sun! Excellent communication through to completion and beyond. Each of their teams performed their work using the highest quality goods so all the solar panels, piping, electrical and plumbing looked extremely slick and neat. They worked with me on placement of the generator, panels and where in the basement to run everything through, even coming back to fine tune some of the work they had done. One of the inspectors for permit approval even added a nice job and a smiley face on the white approval slip. Timeliness and pride in their work was much appreciated. I couldn't be more happier with the work and highly recommend Green Sun!

— Dimitra2016Reviewed us onAngiYelp

Green Sun Energy Services replied

Dimitra, thank you for taking the time to leave such a detailed review. It means a lot to hear that the solar installation and generator work met your expectations back in 2016, and we're glad the soft wash brought you back nine years later. The inspector's smiley face is a first for us — we'll take it.

Why Dimitra chose Green Sun Energy Services

Clean the cause, not just the surface, without blasting your home with unnecessary pressure.

More than solar panels: a professionally managed energy system, from design and permitting through installation, inspection, activation and ongoing support.

Complete backup power, from sizing and installation to the service that keeps it ready.

What makes Green Sun Energy Services different

  • Soft washing: cleaned by a team trained in soft washing, using the right cleaning solution and low pressure for each surface. Fully licensed and insured. On this home: a soft wash of 1,513 sq ft.
  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with SolarEdge optimizers on every panel so each one reports its own output. On this home: an 8.505 kW solar array of 27 LG 315N1K-G4/40mm panels, a SolarEdge SE7600A-US000NNR2 (25Y) W/ P320 Optimizers HD Wave inverter and the QuickMount mounting system.
  • Standby generators: installed and serviced as a Generac Authorized Sales and Service Dealer, by factory-authorized Generac technicians. On this home: a Generac 6462 standby generator (16 kW LP / 16 kW NG) running on natural gas, on a 200-amp transfer switch (managed whole house) and serviced by Green Sun Energy Services.
  • Warranty: backed by a 5-year solar workmanship warranty and a 5-year generator workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 41 completed soft wash projects, 138 completed solar projects and 444 completed standby generator projects across Monmouth County and 46 soft wash projects, 361 solar projects and 621 standby generator projects throughout New Jersey.

Our work in Asbury Park

Green Sun Energy Services has completed 2 soft washes, 5 featured solar projects, 2 standby generator installations and 2 generator service customers in Asbury Park. Asbury Park, a city on the Atlantic Ocean in Monmouth County, is served by JCP&L.

Generate electricity on your roof and use it to help power your vehicle.

Thinking about solar, a standby generator, or a soft wash for your Asbury Park home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Asbury Park, NJ
Services
Softwash Service, Solar Panel Installation, Standby Generator Installation, Standby Generator Service
Client since
September 2016

Solar

Manufacturer & model
LG 315N1K-G4/40mm
Panels
27
System size
8.51 kW
Inverter
SolarEdge SE7600A-US000NNR2 (25Y) W/ P320 Optimizers HD Wave
Mounting system
QuickMount
Estimated first-year production
7,864 kWh
Share of the home's electricity
69%
Electric utility
JCP&L
Workmanship warranty
5 years

Standby generator

Manufacturer & model
Generac 6462
Rated output
16 kW LP / 16 kW NG
Fuel
Natural Gas
Home sized for
2,400 sq ft
Electrical service
200 amp
Transfer switch
200 amp
Load management
Managed Whole House
Workmanship warranty
5 years

Exterior cleaning

Surface cleaned
1,513 sq ft

Questions from Asbury Park homeowners

SolarWhat happens to production in winter?

Panels keep producing, but shorter days normally mean lower monthly output than spring and summer. Cold modules actually operate efficiently; what reduces winter production is day length, sun angle, cloud, snow cover and shading. A properly designed system models production across the whole year rather than a good month.

SolarWho receives the certificates on a leased system?

That depends on the lease or power purchase agreement. Where solar is third-party owned, the system owner commonly retains the renewable-energy certificates and related incentives because it owns the generating equipment. The contract should say explicitly who owns the environmental attributes.

Soft washingWill roof cleaning take the moss and lichen off?

Proper treatment can kill both, but neither necessarily releases straight away. Dead moss tends to weather off gradually, and lichen can stay physically attached long after it has been killed. Scraping or pressure washing it off an asphalt roof takes granules with it, so patience is the safer route.

Soft washingHow long should a deck dry after washing before it is stained?

The wood should be sufficiently dry for the particular coating being used. Drying time varies with weather, humidity, shade, wood species and moisture content. Follow the stain or coating manufacturer's moisture and preparation requirements.

Standby generatorWhat fuel does a home standby generator use?

Most residential air-cooled standby generators are designed to run on either natural gas or vapour-withdrawn liquid propane. The generator and its fuel system have to be configured for whichever is chosen, and the required pressure, capacity and consumption figures depend on the model.

Standby generatorDoes new gas piping have to be pressure tested in Asbury Park?

Yes. Gas piping subject to the adopted fuel-gas code must be inspected and tested before it is accepted. New Jersey adopts the 2024 International Fuel Gas Code, which governs the inspection, the test pressure and how long the test has to hold.

Standby generatorWhat does a whole-house generator actually mean?

Whole-house generally means the transfer equipment serves the home's main electrical system rather than a small emergency-circuit panel. It does not promise unlimited capacity. High-demand appliances may still be prioritized or briefly shed while generator capacity is being used elsewhere.