Solar, Roofing and EV Charger Installation in Kenilworth, NJ | 22 Panels and a Matching Charger

Kenilworth, NJ · Client since July 2022

Daniel from Kenilworth, NJ has been a Green Sun Energy Services client since July of 2022, and came back for a car charger two years later. The roof and the array went in four days apart. The charger, when it came, was chosen to match what was already on the wall.

3,800 square feet of new roof

Finished on 12 September 2022: a single layer stripped to the sheathing and carted away rather than covered over, then 3,800 square feet of composition shingle in pewter gray, warranted fifty years, with continuous soffit vents at the intake.

22 panels and 8.91 kW

Four days later the array went up – 22 REC 405-watt modules on a SolarEdge Energy Hub inverter, rail-free mounting, split 6.48 and 2.43 kW across two roof faces, estimated at 11,012 kilowatt hours in the first year and interconnected by PSE&G in November. A hundred and ninety-two feet of critter guard went on around it.

A SolarEdge charger, matched to the inverter

February of 2025, and the make is the whole point. This is a SolarEdge charger rather than the ChargePoint we fit more often – a 40-amp circuit at 7.7 kW, adding roughly 25 miles of range an hour. It was chosen because a SolarEdge Energy Hub inverter was already on the wall. The car, the panels and the production now report through one system instead of three that do not talk to each other, and the household has one app to look at rather than a folder of them.

Four days, and then two and a half years

The four days between the roof and the array were deliberate. Panels are fixed to the roofing system beneath them, so an array laid over a roof that still needs replacing is simply a bill to take the array off again, deferred. The two and a half years before the charger were not planned, and that is the more useful half of the story: nothing about the 2022 work had to be undone to add a car charger in 2025. The service was already understood, the inverter already the right one to hang a charger off, and the roof underneath it all had decades left on its warranty. Work done in the right order keeps paying long after everybody has stopped thinking about it.

Why Daniel chose Green Sun Energy Services

One company designs the roof and solar system together, so there is no finger-pointing between a roofer and a solar installer.

Professional home EV charging made simple, from electrical design through final inspection.

What makes Green Sun Energy Services different

  • EV charging: installed with certifications from Qmerit, ChargePoint, Enphase, SolarEdge and Tesla, by a licensed electrician and fully managed by our team. On this home: a SolarEdge SE-EV-SA-KIT-LJ40P EV charger on a 40-amp circuit.
  • Roofing: installed as a GAF Certified Roofing Contractor (#CE28608), with a GAF Timberline Lifetime Roofing System like the one on this home. On this home: a new roof over 3,800 sq ft.
  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with SolarEdge optimizers on every panel so each one reports its own output. On this home: an 8.91 kW solar array of 22 REC REC405AA-PURE panels, a SolarEdge SE7600H-USNBBL14 HD Wave Energy Hub inverter, the Snap-N-Rack mounting system and 192 ft of critter guard.
  • Warranty: backed by a 50-year roof warranty, a 5-year roofing workmanship warranty and a 25-year solar workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with 10 completed EV charger projects, 10 completed roofing projects and 20 completed solar projects across Union County and 91 EV charger projects, 92 roofing projects and 361 solar projects throughout New Jersey.

Our work in Kenilworth

Green Sun Energy Services has completed 1 EV charger installation, 1 roof replacement and 2 featured solar projects in Kenilworth. Kenilworth, a borough in Union County, is served by PSE&G.

Protect the investment you've made in your home's exterior.

Thinking about a new roof, solar, or an EV charger for your Kenilworth home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Kenilworth, NJ
Services
EV Charger Installation, Roofing Installation, Solar Critter Guard, Solar Panel Installation
Client since
July 2022

Solar

Manufacturer & model
REC REC405AA-PURE
Panels
22
System size
8.91 kW
Inverter
SolarEdge SE7600H-USNBBL14 HD Wave Energy Hub
Mounting system
Snap-N-Rack
Estimated first-year production
11,012 kWh
Share of the home's electricity
98%
Electric utility
PSE&G
Critter guard fitted
192 ft
Workmanship warranty
25 years

EV charger

Manufacturer & model
SolarEdge SE-EV-SA-KIT-LJ40P
Charging port
CCS (J1772)
Circuit breaker
40 amp
Charging stations
1
Estimated range added per hour
25 mi / 40 km

Roof

System
GAF Timberline Lifetime Roofing System
Area replaced
3,800 sq ft
Warranty
50 years
Workmanship warranty
5 years

Questions from Kenilworth homeowners

SolarWhat does NEC Article 690 cover?

It is the principal code article for photovoltaic systems, covering PV circuits, conductors, overcurrent protection, disconnects, wiring methods, grounding, labelling, rapid shutdown and equipment installation. New Jersey currently uses the 2023 edition.

SolarHow is the number of panels for a Kenilworth house decided?

It starts with the home's actual electricity use, then with how much usable roof or ground area there is. A proper design looks at twelve months of consumption, expected future use, roof orientation, shading, roof dimensions, code-required setbacks, module wattage and the limits the utility places on interconnection.

SolarCan New Jersey change its net-metering rules?

Yes. Energy statutes, Board of Public Utilities regulations and utility tariffs can all change. A proposal should describe the rules as they currently stand rather than guarantee that they will hold for decades.

RoofingWhat is roof flashing?

Sheet material used at transitions and penetrations to direct water away from the joints — chimneys, walls, valleys, skylights, pipes and roof-to-roof transitions. A great many roof leaks start at flashing rather than in the field of the roof, which is why the detailing matters more than the brand of shingle above it.

RoofingDo I need to remove the old shingles, or can I roof over them?

A full tear-off is usually the better long-term approach because it allows the contractor to inspect the roof deck, correct flashing, improve underlayment, and avoid hiding damage. Local code and manufacturer warranty requirements may also limit when an additional layer is allowed.

EV chargingCan I charge an EV parked at the curb in Kenilworth, NJ?

That depends on municipal rules, property boundaries, sidewalk safety, and whether the parking space is public or private. Running a cord across a public sidewalk is generally problematic and should not be assumed acceptable.

EV chargingWhat connector should I install: NACS or J1772?

NACS is now widely adopted by North American automakers, while many existing vehicles use J1772 for AC charging. Adapters are common. Choose based on your current vehicle, likely future vehicles, charger quality, and long-term support rather than connector branding alone.

Scroll to Top