Solar Panel Installation and Roofing Installation in Lacey Township, NJ | Two Layers Off and 34 Panels On

Lacey Township, NJ · Client since March 2017

Alan Jefferys has been a Green Sun Energy Services client since March of 2017, when the roof and the solar array were bought on the same day. The roof was finished on 6 July 2017 and the array eight days later.

Two layers off, 1,700 square feet on

This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one — twice the tear-off and twice the disposal on a compact roof. What went back on is GAF Timberline American Harvest rather than the standard line used on most of the roofs described here, carrying the same 50-year warranty, over deck protection on the exposed sheathing, with aluminum drip edge along 142 feet of rakes and eaves.

34 panels and 10.2 kW

Thirty-four Hanwha Q.PEAK panels at 300 watts each came to 10.2 kW on Ecolibrium Solar mounting, finished on 14 July 2017, running into a SolarEdge SE10000A inverter with an optimizer on every panel. JCP&L is the utility and the first year was designed for about 14,317 kWh.

The number worth noticing here

Ten point two kilowatts designed for 14,317 kWh works out at roughly 1,400 kWh for every kilowatt installed, which is at the strong end of anything on this site. Thirty-four panels on 1,700 square feet is also dense coverage — this array uses a great deal of the available roof, and the roof it is using happens to be well placed. Those two things together are why a modest house carries a system this size.

Why the roof went first

An array is bolted to a roof for twenty-five years and more, so shingles at the end of their life underneath one become a second job with a date already on them — panels off, roof on, panels back. With thirty-four panels covering most of a 1,700 square foot roof, that job would effectively be the whole array and the whole roof at once. Eight days of sequencing removed it, and the panels went down onto a deck that had been stripped, seen and covered properly for the first time in two roof generations.

"Glen and his team were great from start to finish. They truly value their costumers and remember who you are long after they've finished installation. He was straight forward and ensured we had a system that met my needs. High quality installation looks great, better than other systems in my neighborhood. It's met and exceeded my expectations." - Robert R: Google

2019Reviewed us onGoogle

Green Sun Energy Services replied

Thank you. Two layers of shingle off and thirty-four panels on at the same house in Lacey Township is a job with two crews and one deadline, and remembering who you are afterwards is the part that keeps a company honest. Being straightforward about what the system needed to do is how it should start.

Why Lacey Township homeowners choose Green Sun Energy Services

One company designs the roof and solar system together, so there is no finger-pointing between a roofer and a solar installer.

What makes Green Sun Energy Services different

  • Roofing: installed as a GAF Certified Roofing Contractor (#CE28608), with a GAF Timberline Lifetime Roofing System like the one on this home. On this home: a new roof over 1,700 sq ft.
  • Solar: design and installation supervised by a NABCEP-certified professional (#PVA-111016-016148), with SolarEdge optimizers on every panel so each one reports its own output. On this home: a 10.2 kW solar array of 34 Hanwha Q.PEAK BFR-G4.300/32mm panels, a SolarEdge SE10000A-US000NNR2 Inverter (12Y) W/ P320 HD Wave inverter and the Ecolibrium Solar mounting system.
  • Warranty: backed by a 50-year roof warranty, a 5-year roofing workmanship warranty and a 15-year solar workmanship warranty.
  • Local: locally owned and operated in New Jersey since 2010, NJHIC licensed (#13VH06229000), with completed roofing projects and 48 completed solar projects across Ocean County and 92 roofing projects and 361 solar projects throughout New Jersey.

Our work in Lacey Township

Lacey Township, on Barnegat Bay in Ocean County, is served partly by JCP&L and partly by Atlantic City Electric.

Generate electricity on your roof and use it to help power your vehicle.

Thinking about a new roof, solar, or both for your Lacey Township home? Tell us about your project here or call 732-410-7818.

Power it. Protect it. Maintain it.

Project Facts

Location
Lacey Township, NJ
Services
Roofing Installation, Solar Panel Installation
Client since
March 2017

Solar

Manufacturer & model
Hanwha Q.PEAK BFR-G4.300/32mm
Panels
34
System size
10.20 kW
Inverter
SolarEdge SE10000A-US000NNR2 Inverter (12Y) W/ P320 HD Wave
Mounting system
Ecolibrium Solar
Estimated first-year production
14,317 kWh
Share of the home's electricity
92%
Electric utility
JCP&L
Workmanship warranty
15 years

Roof

System
GAF Timberline Lifetime Roofing System
Area replaced
1,700 sq ft
Warranty
50 years
Workmanship warranty
5 years

Questions from Lacey Township homeowners

RoofingCan gutters cause roof leaks?

Yes. Clogged, undersized, improperly pitched, or detached gutters can overflow and keep water against fascia and roof edges. Ice buildup in gutters can also worsen winter water problems.

RoofingWhat building code applies to residential roofing in Lacey Township, NJ?

New Jersey adopts statewide construction codes through the Uniform Construction Code. Local officials enforce the State-adopted code, so project-specific details should be confirmed with the municipal construction office.

RoofingWhy does using a complete system from one manufacturer matter to the warranty?

Because the enhanced warranties and the wind coverage generally require qualifying accessories alongside the shingles — the starter strips, the deck protection, the ridge caps and, depending on the warranty, the leak barrier or the ventilation. Buying the right shingle and substituting the accessories around it can leave the roof outside the coverage the homeowner thought was being bought.

Solar and RoofingWhat happens when the roof under an existing solar array needs replacing?

The array is professionally removed before the roofing work and reinstalled once the new roof is complete — commonly called a remove and replace. New roof-interface and mounting components are usually advisable rather than reusing ageing penetrations and attachment hardware, though the mounting-system manufacturer's instructions decide what may be reused.

SolarDoes production have to match usage every month?

No. New Jersey net metering works over an annualised period rather than month by month, so credits accumulated in high-production months are available during the low-production ones.

Scroll to Top