Meet our featured client in Maplewood
Solar panels give New Jersey homeowners a way to generate their own electricity and reduce dependence on the grid. For any home in Maplewood, Essex County, New Jersey, a professionally installed solar system can lower monthly energy use from utility sources and add lasting value to the property. If you are searching for the best solar company in Maplewood NJ, you want a team that is trained, credentialed, and accountable for the work they put on your roof.
Green Sun Energy Services, LLC is a locally owned and operated NABCEP-certified solar installer based in Middletown, NJ, and in business since 2010. We completed solar panel installation in Maplewood, Essex County, New Jersey, serving one client in 2017, and that client left a review of our work. When you need a local solar installer near Maplewood NJ, we bring the same disciplined approach to every job that has defined our work from the start.
Tracy from Maplewood, NJ has been a Green Sun Energy Services client since June of 2017. She signed at the end of June and the array was producing by late August, 18 LG 335 watt panels on Enphase IQ6 microinverters,…
After extensive research and in-person meetings with representatives from SolarCity, SunRun, and Green Sun Energy, we decided to go with Glen and his company Green Sun Energy. We were not disappointed. Although it is a smaller company, they gave us better pricing, great customer service…
Does solar eliminate the electric bill completely?
Not necessarily. Solar can offset most or all of a year's energy use, and the utility can still bill customer charges, meter charges, non-bypassable charges, taxes and any net electricity purchased. What appears on the bill depends on the utility and the tariff.
How is the number of panels for a Maplewood house decided?
It starts with the home's actual electricity use, then with how much usable roof or ground area there is. A proper design looks at twelve months of consumption, expected future use, roof orientation, shading, roof dimensions, code-required setbacks, module wattage and the limits the utility places on interconnection.
Can the system be switched on before the utility approves it?
A grid-connected system should not be placed into normal parallel operation until the utility has issued the required authorisation. Running it beforehand can breach the interconnection agreement and the utility's requirements.